Evamp & saanga Interview Questions, Process, and Tips

Ques:- In 60 reems of paper 40 reems were utilised then what percent will remain?
Recent Answer : Added by Admin On 2020-05-17 11:59:18:

Total=60reems
Utilized=40reems
Un utilized= 60-40=20
Percentage of remainder 20/60=.3333
0.33333*100=33.333%

Ques:- There is a whole number n for which the following holds: if you put a 4 at the end of n, and multiply the number you get in that way by 4, the result is equal to the number you get if you put a 4 in front of n. In other words, we are looking for the number you can put on the dots in the following equation: 4… = 4 ?…4 Which number must be put on the dots to get a correct equation?
Ques:- What are your goals?
Ques:- One pipe can fill a tank three times as fast as another pipe. If together the two pipes can fill tank in 36 min, then the slower pipe alone will be able to fill the tank in?
Recent Answer : Added by Thrinayani sanagapati On 2022-08-14 16:28:52:

1/x+1/3x=1/36
4/3x=1/36
36*4=3x
X=48
So the slower pipe alone fill the tank in 48 minutes.

Ques:- What can six men do at a time which six women cant do?
Recent Answer : Added by Admin On 2020-05-17 12:04:27:

Six men can at a time put mangala sutra (marriage) to their
spouses where six women cant do

Ques:- Why would you like to join Exl?
Ques:- A light bulb is hanging in a room. Outside of the room there are three switches, of which only one is connected to the lamp. In the starting situation, all switches are 'off' and the bulb is not lit. If it is allowed to check in the room only once to see if the bulb is lit or not (this is not visible from the outside), how can you determine with which of the three switches the light bulb can be switched on?
Ques:- Describe a time when you have made a split second decision? Was it the correct one?
Ques:- What is sales and marketing?
Ques:- Gold is 19 times as heavy as water and copper is 9 times. In what ratio should these metals be mixed so that the mixture may be 15 times as heavy as water?
A. 2 : 1
B. 3 : 2
C. 4 : 3
D. 5 : 4
Recent Answer : Added by narendra On 2022-09-18 09:02:16:

b

Ques:- “A soldier loses his way in a thick jungle. At random he walks from his camp but mathematically in an interesting fashion. First he walks one mile East then half mile to North. Then 1/4 mile to West, then 1/8 mile to South and so on making a loop.. Finally how far he is from his camp and in which direction. ..”
Recent Answer : Added by Harsh Shah On 2021-07-22 15:55:58:

Soldier have to move 0.75 miles to West and then 0.375 miles to South to reach the camp.
How:-
Firstly soldier moving 1 mile to East from camp and then 1/2 miles= 0.50 miles to North .

Then it is moving 1/4 miles =0.25 miles to west
And then 1/8 miles =0.125 miles to South

Now we just have to count the difference and minus the value of camp to East with the value of North to west = 1mile – 0.25miles(1/4) = 0.75 miles

Same case with north and south = 0.50 miles(1/2) – 0.125 miles(1/8) = 0.375 miles

Hence proves to return camp the soldier have to move 0.75 miles to west and 0.375 miles to south

Ques:- Hr asked aboout me
Ques:- On which basis should be select you?
Ques:- Could You Say Something About Yourself
Ques:- If a number is subtracted from its square we get 272. Find the number?
Recent Answer : Added by Lucky Sithole On 2022-03-09 16:37:45:

X×x-x=272
X^2-x-272=0
(X-16) or (x-17)
X=16 or x=17

17^2-17=272
Answer Is 17

Ques:- A works twice as fast as B. If B can complete a work in 12 days independently, the number of days in which A and B can together finish the work is?
Ques:- Tell me about a time when you overcame a challenge?
Ques:- X, Y, Z together started a business. X invested Rs.6000 for 5 months Y invested Rs.3600 for 6 months and Z Rs.7500 for 3 months. If they get a total profit of Rs.7410. Find the share of X?
Ques:- How long does a train 165 meters long running at the rate of 54 kmph take to cross a bridge 660 meters in length?
Recent Answer : Added by Nayana On 2022-09-23 18:07:00:

Speed of train = 54km/hr
= 54 x (5/18) m/s
= 15 m/s
Length of train = 165m
Time required to cross a bridge of 660m in length = (660+165) / 15
= 55 seconds

Ques:- The work is very hard then how to overcome stress?
Ques:- Number Series 25,25,22,22,19,19,?
Recent Answer : Added by janane On 2022-08-14 16:31:06:

16

Ques:- Can you share a few of your aspirations beyond this job?
Ques:- Distance between two poles is 50 meters. A train goes by 48 at a speed of kmph. In one minute how many poles will be crossed by the train ?
Recent Answer : Added by Admin On 2020-05-17 12:01:58:

16 poles per min
48kmph=48000 meters per hr
=800 meters per min
800/50=16 poles per min

Ques:- Joe is fencing in a square area of 576 square feet. Fence posts, which are needed every three feet, cost 32.00 each. The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Recent Answer : Added by Vivek Bharadwaj On 2022-08-14 16:33:40:

Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?

Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft

Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.

Number of Fence post needed = 96/3 = 32

1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024

Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432

Total Cost = 432 + 1024 = 1456

Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- What is the average of first 10 prime numbers ?
Recent Answer : Added by Rajesh kanna On 2022-09-02 17:04:05:

12.9
2+3+5+7+11+13+17+19+23+29=129
129/10=12.9

Ques:- Myself, education details and total working experience with details.
Ques:- In a certain department store, which has four sizes of a specific shirt, there are 1/3 as many small shirts as medium shirts, and 1/2 as many large shirts as small shirts. If there are as many x-large shirts as large shirts, what percent of the shirts in the store are medium?
Ques:- Tell me about youtcollege days?
Ques:- A man leaves a point P at 6 a.m. and reaches the point Q at 10 a.m. another man leaves the point give at 8 a.m. and reaches the point P at 12 noon. At what time do they meet?
Recent Answer : Added by Jilan Atef On 2021-02-24 17:31:36:

9 am

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top