Find best Interview questions and answer for Emirates flight catering Job. Some people added Emirates flight catering interview Questions in our Website. Check now and Prepare for your job interview. Interview questions are useful to attend job interviews and get shortlisted for job position. Find best Emirates flight catering Interview Questions and Answers for Freshers and experienced. These questions can surely help in preparing for Emirates flight catering interview or job.
This page contains the most recently asked technical questions and answers in the Emirates flight catering.
All of the questions listed below were collected by students recently placed at Emirates flight catering.
These both ans are wrong Instead of cutting it vertically we cut it horizontally. we got 2 equal halves.
let’s say the Cost Price is 1000x. (CP)
The selling price is also the same as the Cost price. So, here SP=CP (But he sells 950gm instead of 1000gm)
Instead of 1000gm, he is selling 950 grams at the CP. So he sells 050 gms @1000x price. So his net profit is 50gm.
Now 1000gm is 1000x Rs
So, 50gms is 50x rs. [Apllied Unitary Method]
So his profit percentage is:
Profit Percentage Formula: {(Profit/CP)*100%}
So, Here profit is 50x;
CP is 1000x;
so putting the value in the formula we get, Profit Percentage is: (50x/1000x)*100% =(5000x/1000x)%=5%.
B, 8mm x 5 mm = 40 mm^2
1000mm x 1000mm = 1,000,000mm^2
= 1,000,000 mm^2/40mm^2
= 25,000
Since, there are 10 points on the circle and to draw a chord we need to connect any two points on the circle to make it a straight line, which implies that the number of chords = No of lines connecting any two points out of the 10 points
= 10C2 = 10*9/2 = 45 chords.
9
Pfull = 4 Hrs; Qfull = 5 Hrs
Assume velocity Vp = x then Vq = 4/5 x –> avg velocity = (5/5 + 4/5) / 2 = 0.9
If fastest time = 4hrs then the time it would take to fill up tank by alternating is 4/0.9 = 4.44 Hrs
say the work is w and let no of days taken by b is ‘x’ which
we have to calculate
so work done by a in one day is w/6
work done by b in one day is w/x
a and b together can do work in 4 days ie=(w/6)+(w/x)=(w/4)
solving equation x=12
so no of days taken by b=12