- Electronica Finsmart Solutions General Aptitude Interview Questions
- Electronica Finsmart Solutions Trainee Interview Questions
- Electronica Finsmart Solutions Personal Questions round Interview Questions
- Electronica Finsmart Solutions HR Interview Questions
- Electronica Finsmart Solutions Lead Interview Questions
if it is for MIcrosoft Interview Question, I sure they will
give you the job if you answer, “Google it”.
16.8 sec
Required Ratio=3:2
( e ) None of these
Let’s say,
I have x coins of 50 paise and (80-x) coins of 100 paise,so the equation is like this ,
50x + (80-x)*100 = 64*100
x = 32
So ,I have 32 coins of 50 paise
let the total no of breads be x.
1st man 2nd man
x- (x/2) – 1/2 – 1/2((x-1)/2) – 1/2 ….. so on.
ans is 31.
first ate : 15.5 + .5 = 16 remaining 15
second ate : 7.5+0.5 = 8 remaining 7.
third ate : 3.5 +0.5 = 4 remaining 3.
fourth ate : 1.5 + 0.5 = 2 remaining 1
fifth ate : 0.5 + 0.5 = 1 remaining 0
For optimal size of a project team..
the % increase in staff size should be “Zero”
reason:
additional member directly proportional to increase in
staff size..
Given y/x = 1/3, x+2y =10
3y=x
Then substitute x=3y in x+2y=10
3y+2y=10
5y=10
y=2
Then substitute y=2 in x=3y
x=3*2
x=6
: x=6, y=2
Soldier have to move 0.75 miles to West and then 0.375 miles to South to reach the camp.
How:-
Firstly soldier moving 1 mile to East from camp and then 1/2 miles= 0.50 miles to North .
Then it is moving 1/4 miles =0.25 miles to west
And then 1/8 miles =0.125 miles to South
Now we just have to count the difference and minus the value of camp to East with the value of North to west = 1mile – 0.25miles(1/4) = 0.75 miles
Same case with north and south = 0.50 miles(1/2) – 0.125 miles(1/8) = 0.375 miles
Hence proves to return camp the soldier have to move 0.75 miles to west and 0.375 miles to south
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
Let the person ate x banana on first day, so below is the equation for five days
X+x+6+x+12+x+18+x+24=100
So, he ate 8 banana first day
In a cube all the diagonal and sides are equal, we can go diagonally.
1, 3, 10, 21, 64, 129, 356, 777
a
8+1=9
9+2=11
11+3=14
14+4=18
18+5=23
and finally
23+6=29
the sum of first 4 primes numbers =2+3+5+7 =>17
16.25