Since, there are 10 points on the circle and to draw a chord we need to connect any two points on the circle to make it a straight line, which implies that the number of chords = No of lines connecting any two points out of the 10 points
= 10C2 = 10*9/2 = 45 chords.
150 m
297
1620
Let cost for apple be a Cost for banana be b and Orange be c
So by first value expression becomes 17a + 13b + 9c =130 ———-1 therefore if you further solve a = (130 – 13b – 9c)/17 ———- 2 the second expression becomes: 13c + 7a + 10b = 100 ———- 3 If you put value of a in second expression it becomes: 13c + 7[(130 – 3b – 9c)/17] +10b = 100
Further if you solve you get value of b:
b = 10 – 2c ———-4
put value of b from 4 in 1
17a + 13 [10 – 2c] + 9c = 130
Further if you solve you find value of a
a = c ———-5
Put 5 in 3
13c + 7c + 10b = 100
further solve you get: c = 1 ———-6
from 5 and 6
a = c = 1 ———-7
Substitute value of c in expression 4
b = 10 – 2c b = 10 -2 * 1 b = 8 ———-8
therefore a + b + c = 10
19
Number of persons between Vijay and Jack = 48 – (14 + 17) = 17.
Now, Mary lies in middle of these 17 persons i.e. at the eight position.
So, number of persons between Viji and mary = 7.
It is mentioned the the boat is tied with the rope to the tree. So first one will be crossing the river and the other with the help of the ropes tied to the tree will be able to pull the both back and then he will be crossing the river.
let the third no be x ,
then the first no is 3x ,
second no is 2*3x ie 6x
average is (3x+6x+x )/3 = 20
10x/3 = 20
x= 60/10 = 6
third no is 6 , second is 6x = 36, first no is 3x = 18
largest no is 36 i.e second no
100
Diagonal of square=1.414* a, where a is side of square.
ans=1.414*20
ans=28.28
Hi frnds I think U got wrong,
It was said that 4 ends not 4 corners
Here Ends are sides
So there is no way of extending a side
So the answer is incresing the depth
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
2^a = 2 x 2+a
a^3= 2 x a + 3
=> 4+a= 2a + 3
=> a = 1
Previous their age was 21 and 18 respectively
Presently, after 6 years the age is 27 and 24.
27