Ques:- Have you applied to any other areas apart from banking?
Ques:- Some boys are sitting in a row. P is sitting fourteenth from the left and Q is seventh from the right. If there are four boys between P and Q, how many boys are there in the row ?
Ques:- Have you been absent from work more than a few days in any previous position?
Ques:- Which training/projects have you carried out ?
Ques:- Ramesh can finish a work in 20 days and Sushil in 25 days. They both work together for 5 days and then Sushil goes away. In how many days will Ramesh complete the remaining work?
Ques:- Difference between mass and weight
Ques:- The seven digits in this subtraction problem are 0, 1, 2, 3, 4, 5 and 6. Each letter represents the same digit whenever it occurs. D A D C B – E B E G is equal to B F E G.What digit is represented by each letter?
Ques:- What about my family backgroung?
Ques:- A sum of money becomes double itself in 8 years at simple interest. How many times will it become 10 years at the same rate?
Recent Answer :
: 5x/4
Ques:- Personal growth
Ques:- In a certain code, TOGETHER is written as RQEGRJCT. In the same code, PAROLE will be written as?
Recent Answer :
: NCPQJG
Ques:- A man came from usa , he was fat so he decided to walk to reduce fat in his body. So he daily starts walking at exactly at 3pm he walks at 4km/hr for some distance and then 3km/hr on inclined road while going up. And 6km/hr while coming dow?
Ques:- Pushpa is twice as old as Rita was 2 years ago. If the difference of their ages be 2 years, how old is Pushpa today?
A. 6 years
B. 7 years
C. 8 years
D. 10 years
Recent Answer :
: 6 yeara old
Ques:- Design an elevator system for a 100 story building. Address all issues, like number of elevators, speed of each (Not numerically), waiting times etc. There would be 100-200 people living/working on each floor.
Ques:- Eg: There are three Bulbs which have a switch placed far away from visibility, Match the pairs of the switch and bulbs…
Ques:- What is the motto inscribed under our national emblem?
Ques:- Why should I hire you from the outside when I could promote someone from within?
Ques:- Find out the wrong number in a given series.
124, 133, 142, 152, 160
124, 133, 142, 152, 160
A. 133
B. 142
C. 152
D. 160
Recent Answer :
: 2 minuts the speed ofthe train
Ques:- How did you prepare for this interview?
Ques:- Tell me the ways you can choose 3 desserts from a menu of 10?
Recent Answer :
: 10C3 = 120
Ques:- Zulus always speak truth and Hutus always speak lies. There are three persons A, B,& C. A met B and says “I am a Zulus as I am a Hutu”. We don't know what exactly he said. The B meets C and says to C that ” A is a Zulu”. Then C replied ” No, A…
Recent Answer :
: Ok
Ques:- If you have some problem with your job timing, please tell me?
Ques:- 3, 5, 8, 13, 24, 39, 72 FIND THE WRONG NUMBER
Recent Answer :
: 3*2-1=5
5*2-2=8
8*2-3=13
13*2-4=22
22*2-5=39
39*2-6=72
so series is 3,5,8,13,22,39,72
24 should be replaced by 22
24 is wrong…….
Ques:- If selected how many years you will continue to work with the company
Ques:- Tell me something about ur school days?
Ques:- Why do you want to change this job?
Ques:- 16 men can complete a piece of work in 25 days. In how many days can 20 men complete that piece of work?
Recent Answer :
: 20
Ques:- What do u mean by Friendship?
Ques:- A boat can move upstream at 25 kmph and downstream at 35 kmph, then the speed of the current is?
Recent Answer :
: upstream = 25km/hr
downstream=35km/hr
so…if the speed of current would be 5km/hr and boat speed = 30km/hr
so that it will be change towards upstream and downstram…
Ques:- Why you wants to work with us which is far away from your home?
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.