C.1175
2x+x+2x+x = 300m
6x = 300
x = 300/6 = 50m
50m x 100m = 5,000 m2
The local value of 7 in the number is at 10000 so 7×10000 and face of 7 is 7
So 70000 -7 so the answer is C 69993
35 hours
Palwal
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
240 m
answer can be 1,2,3,4 can’t be determined exact number
just explaining a case:
there are 10 people in the party.
name of people no. of people with they made handshake list of those people(this can vary but showing the possibility)
1 1 9
2 2 8, 9
3 3 7, 8, 9
4 4 6, 7, 8, 9
5 5 6, 7, 8, 9. 10
6 6 4, 5, 7, 8, 9, 10
7 7 3, 4, 5, 6, 8, 9, 10
8 8 2, 3, 4, 5, 6, 7, 9, 10
9 9 1, 2, 3, 4, 5, 6, 7, 8, 10
10 4 5, 6, 7, 8, 9
jack got 9 different answer so jack can be either 4th number or 10th number and jack’s wife know jack very well so she can’t have handshake with jack so if 4th is jack then she can’t be handshake with 6,7,8,9, in this case she can be 1,2,3, 5, 10 and now depending upon which no is jack’s wife she can have hand shake with- 1- 4 people, and if jack is number 10 then she can’t be 5,6,7,8,9 so again depending upon her number she can handshake with people in range of 1-4
540 meters or 0.54 km