let the total work to be done =1
so a+b+c=1 (say)
then a and b are supposed to do 7/11 th of work
so c= 1- (7/11)
c=4/11
therefore c gets (4/11)*550
=200 is the answer
Time =9 seconds
Speed =(60×518) m/sec=(503)m/sec
∴ Speed =DistanceTime
Length of the train (Distance) = (Speed × Time) = (503×9) m=150 m.
Now as per question, Kamal invested for 12 months and Sameer invested for 7 months.
So, Kamal:Sameer=(9000×12):(8000×7)
=108.56=27:14
Sameer ratio in profit will be =6970×4114=Rs.2380
perimeter = pi(r) + 2r
= 19.782 + (12.6)
= 32.382 cm
26 rupees and 53 paise
answer can be 1,2,3,4 can’t be determined exact number
just explaining a case:
there are 10 people in the party.
name of people no. of people with they made handshake list of those people(this can vary but showing the possibility)
1 1 9
2 2 8, 9
3 3 7, 8, 9
4 4 6, 7, 8, 9
5 5 6, 7, 8, 9. 10
6 6 4, 5, 7, 8, 9, 10
7 7 3, 4, 5, 6, 8, 9, 10
8 8 2, 3, 4, 5, 6, 7, 9, 10
9 9 1, 2, 3, 4, 5, 6, 7, 8, 10
10 4 5, 6, 7, 8, 9
jack got 9 different answer so jack can be either 4th number or 10th number and jack’s wife know jack very well so she can’t have handshake with jack so if 4th is jack then she can’t be handshake with 6,7,8,9, in this case she can be 1,2,3, 5, 10 and now depending upon which no is jack’s wife she can have hand shake with- 1- 4 people, and if jack is number 10 then she can’t be 5,6,7,8,9 so again depending upon her number she can handshake with people in range of 1-4
Servlets are faster as compared to JSP, as they have a short response time.
JSP is slower than Servlets – JSP is a HTML-based codes.
Servlets are harder to code, as here, the HTML codes are written in Java – JSPs are easier to code, as here Java is coded in HTML.
In an MVC architecture, Servlets act as the controllers. – In MVC architectures, the JSPs act as a view to present the output to the users.
The service() function can be overridden in Servlets. – The service() function cannot be overridden in JSPs.
4/52 * 3/51
This is Expert Verified Answer
22 people found it helpful
author link
Lipimishra2
Expert
568 answers
113.9K people helped
Let the no. of men (originally) be x.
x no. of men require 10 days.
if however there were 10 men less it will take 10 days more for the work to be finished. ——> means x-10 men require 10+10=20 days.
10x = 20 (x-10)
x = 2x -20 => x = 20.
Answer: 8:10, 7:10
Explanation:
The bus b1, which started at P, reached S at 10:40, passing through the intermediary cities Q and R.
The time taken to travel from P to S
= 3 * 40 + 2 * 15 = 150minute
(journey)+(stoppage) = 2 hrs 30 minutes.
Hence, b1 started at 10:40 – 2:30 = 8:10 at P.
b2 reached Q, starting at U, through the city T, S and R.
The time taken by it to reach S = 4 * 40 + 3 * 15 = 205 minutes = 3 hr 25 minutes.
Hence, b2 started at, 10:35 – 3:25 = 7:10, at U.
500