Answer is 16
1,2,4,7,11,….
1+(1) =2
2+(2) =4
4+(3) =7
7+(4) =11
Therefore
11+(5) =16
835, 734, 642, 751, 853, 981, 532
835,sum(digits)= 16
734 = 14
642=12
751= 13,
853=16,
981=18,
532=10
answer(c)751
B. 9001
( a ) BQDCJCMF
“TERMINAL” split it into the half we get “TERM” “INAL”
Now the first half is decreased by one and the next half is
increased by one, so we get:
“SDQLJOBM” (pls note in the ques we have “SDQIJOBM” where
‘L’ shud have come instead of ‘I’)
so “CREDIBLE” is to “BQDCJCMF”
18
24 days
In 5liter alchol is 20%
In 1liter alchol is0.2÷5=0.04liter
Taken out 2liter solution =3liter solution
Alchol present 3×0.04=0.12liter
7liter water alhol present=0.12liter
12%
Statements :
All mangoes are golden in colour. No golden coloured things are cheap.
Conclusions :
I. All mangoes are cheap.
II. Golden coloured mangoes are not cheap.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
C
12 month=>900Rs+Uniform
1month:75 => 9month:675
675-650=25 =>price of Uniform
obvious
e^(i*pi) + 1 = 0
i think it is a and b