decrease two times
Answer: Option D
Explanation:
As Bob is sitting between Charles and Elena and Douglas is sitting to the left of Elena. We get the following arrangement.
Andy is opposite Bob. Therefore, the final arrangement is as follows.
Fred will be sitting right of Charles if each person interchange his/her place with the person sitting opposite them.
100 steps(1step/sec)
I am working institute
As fast as possible. For example, I will suitable with the working environment within one month.
A = (B*H)/2
H = 2B
formula becomes A = (B*2*B)/2
this can be rewritten as A = (2*B^2)/2
the 2 in the numerator and denominator cancel out and you get:
A = B^2
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
10, 25, 56, 70, 85, 95, 125
56
0.000256
( C ) 6