Black swan data Interview Questions, Process, and Tips

Ques:- Why do u want to change your field from electrical to it industry
Ques:- Which number should come next in the series? 1 – 1 – 2 – 3 – 5 – 8 – 13?
Recent Answer : Added by Raja babu On 2022-09-16 14:51:58:

21

Ques:- Why you are looking to change your job?
Ques:- A 16 story building has 12000ft on each floor. Company A rents 7 floors and company B rents 4 floors. What is the number of square feet of unrented floor space?
Recent Answer : Added by arjun On 2021-12-09 18:40:02:

60000

Ques:- What is diploma?
Ques:- What exatly leadership means?what r the qualities required for it?
Ques:- What was ur first job
Ques:- The price of a candy bar is $1.00. The price of a ten pack of the same candy bar is $7.40. The ten pack of candy bars is what percentage cheaper then purchasing ten candy bars individually?
Ques:- Find the smallest four-digit number which is a multiple of 112?
Recent Answer : Added by Admin On 2022-09-29 19:09:33:

Calculation:
⇒ If 1000 divided by 112, the remainder is 104. ⇒ 112 – 104 = 8 ⇒ If 8 is added to 1000 it will become the smallest four-digit number and a multiple of 112. ⇒ 1000 + 8 = 1008 ∴ The required result will be 1008.

Ques:- On a given day, a bank had 16000 cheques returned by customers. Inspection of the first 800 cheques indicated that 100 of those 800 had errors and were therefore the available immediately for data processing. On this basis, hwo many cheques would be available immediately for data processing on that day?
Recent Answer : Added by Admin On 2020-05-17 12:00:25:

Out of 800 cheques 100 are for data processing.
Out of 16000 cheques = (100/800)*16,000 = 2000 cheques

Ques:- 45 men working 8 hours per day dig 30 m deep. How many extra men should be put to dig to a depth of 50 m working 6 hours per day?
Recent Answer : Added by narmada On 2022-08-24 17:02:48:

answer is 100
[(45 men*8hours)/30 meters]=12 (working rate)
[(x men*5 hours)/50 meters]=12 (working rate is same)
then x=100

Ques:- There is a pond of irregular shape and size. Suggest a method to find the volume of water in the pond.
Ques:- What is the sum of two consecutive even numbers, the difference of whose squares is 84?
Recent Answer : Added by Admin On 2022-09-29 16:21:46:

Let the numbers be x and x + 2.
Then, (x + 2)2 – x2 = 84
⇒ 4x + 4 = 84
⇒ 4x = 80
⇒ x = 20.
∴ The required sum
= x + (x + 2)
= 2x + 2
= 42

Ques:- How many members in your family and who supported you to come in IT Industry?
Ques:- The average temperature was 37C for Monday to Wednesday and 34C for Tuesday to Thursday . If the temperature on Thursday was 4/5 th of that of Monday,what was the temperature on Thursday?
Recent Answer : Added by Jade On 2022-09-22 16:41:17:

First write equations from info:
(A) (Mon + Tue + Wed)/3 = 111 Rearrange as ——–> Tue + Wed = 111 – Mon
(B) (Tue + Wed + Thu)/3 =102 Rearrange as ——–> Tue + Wed = 102 – Thu
(C) Thu = 0.8(Mon)

Substitute equation C into B:
(B) Tue + Wed = 102 – 0.8(Mon)

At this point I changed the values for clearer algebra:
Mon = x
Tue + Wed = y

Re-write equations A & B with new values:
(A) y = 111 – x
(B) y = 102 – 0.8x

Solve simultaneous equations:

111 – x = 102 – 0.8x
111 – 102 = x – 0.8x (Re-arraged)
9 = 0.2x
x = 45

Thus, Mon = 45C

Thu = 0.8(45)
Thu = 36C

So the answer is it was 36C on Thursday

Ques:- A man driving the car at twice the speed of auto oneday He was driven car for 10 min. And car is failed. He left The car and took auto to goto the office .He spent 30 min. In the auto. What will be the time take by car to go office?
A. 25
B. 30
C. 35
D. none
Recent Answer : Added by Admin On 2020-05-17 12:05:50:

this is a simple question but the questionaire needs us to
consume time.
speed of car = 2 * speed of auto.
auto takes 30 mins then car should take only 15 mins.
total time = 10 mins + 15 mins = 25 mins = (a)

Ques:- The cost of four dozen proof machine ribbons and five dozen accouting machine ribbons was Rs.160/-. If one dozen accounting machine ribbons cost Rs.20/-, what is the cost of a dozen proof machine ribbons?
Recent Answer : Added by Admin On 2020-05-17 12:00:20:

15

Ques:- ?Laterite Soil? is found in India in:(a) Western Ghats(b) Eastern Ghats(c) Deccan Plateau(d) Satpura region in Madhya Pradesh
Ques:- Two trains each 250 m in length are running on the same parallel lines in opposite directions with the speed of 80 kmph and 70 kmph respectively. In what time will they cross each other completely?
Recent Answer : Added by Rutika Adsul On 2022-10-01 15:01:23:

12 sec

Ques:- A person travels 800m with some speed and reaches the destination. If he travels 15m/sec more than his previous speed, he will reach the destination 12 sec before. Find out his original speed?
Ques:- Two pipes A and B together can fill a cistern in 4 hours. Had they been opened separately, then B would take taken 6 hours more than A fill the cistern. How much time will be taken by A to fill the cistern separately?
Recent Answer : Added by Vemula Rohan Kumar Reddy On 2021-09-25 16:19:51:

A takes 6 hours to fill

Ques:- A man leaves office daily at 7:00 pm. A driver with car comes from his home to pick him from office and bring back home. One day he gets free at 5:30 and instead of waiting for driver he starts walking towards home.In the way he meets the car and return home on car. He reaches home 20 min earlier than usual.in how much time does the man reach home usually… ? GIVE THE STEPS PLZ…
Recent Answer : Added by Kalyani On 2022-08-14 16:43:07:

Since the car has met the person 20 minutes beforehand, it has saved 10 mins of a journey

A man has started 1.30 hrs before and the car has met him 10 mins before the actual time, he takes to reach daily is 1hr and 20 mins

Ques:- Tell me honestly about the strong points and weak points of your boss (company, management team, etc.)
Ques:- A large tanker can be filled by two pipes A and B in 60 and 40 minutes respectively. How many minutes will it take to fill the tanker from empty state if B is used for half the time and A and B fill it together for the other half?
Recent Answer : Added by Raja On 2022-11-15 16:37:18:

30mins

Let the total time taken to fill the tank be x minutes.

Then, work done by B in half hour + work done by (A+B) in half hour =1.

(
40
1

×
2
x

)+(
60
1

+
40
1


2
x

=1


80
x

+
48
x

=1


240
3x+5x

=1

⇒8x=240

⇒x=30 min

Ques:- U, V, W, X, Y and Z are six police officers, who are parading in two rows, with three in the front row and three in the back row. Each officer in the back row has one officer exactly in the front of him. W and X are at the extreme ends of two different rows. Y is to the right of U and exactly in front of V. If Z is exactly behind W, then which of the following statements is true?
Recent Answer : Added by DK BOSS On 2021-07-21 15:26:06:

Answer: z and u

Explanation:

Y is to the right of U and exactly in front of V. Therefore,

U Y
V

Z is behind W and W and X are at extreme ends. So, W has to be to the right of Y. The final arrangement is as follows.
U Y W
X V Z Therefore, Z and U are at extreme ends is true.

Ques:- WHAT R U DOING IN LAST COMPANY
Ques:- The LCM of two numbers is 75. The GCF is 5. The sum of the numbers is 40. What are the numbers?
Recent Answer : Added by Akshay On 2022-03-09 16:46:01:

15,25

Ques:- Why you want to leave the present company?
Ques:- There are 9 coins. 8 are of 1 gm and 1 is of 2 grams. How will you find out the heavier coin in minimum number of weighing and how many weighing it will need?
Ques:- You have two jars, 50 red marbles and 50 blue marbles. A jar will be picked at random, and then a marble will be picked from the jar. Placing all of the marbles in the jars, how can you maximize the chances of a red marble being picked? What are the exact odds of getting a red marble using your scheme?
Recent Answer : Added by Admin On 2020-05-17 12:01:41:

put 1 red marble in one jar and all the rest (99) in the
other.
This gives you 50% from the first jar (if they pick that
jar they will get red 100% of the time). For the other jar
the chances are 49/99 or 49.494949%. Divide that by 2 and
its 24.7474%. Total odds are 50% plus 24.7474% = 74.7474%

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top