- Bellwether asset management, inc. General Aptitude Interview Questions
- Bellwether asset management, inc. Trainee Interview Questions
- Bellwether asset management, inc. Personal Questions round Interview Questions
- Bellwether asset management, inc. HR Interview Questions
- Bellwether asset management, inc. Lead Interview Questions
C. 20
60*5/18*9=150
Let’s assume the length of each train is ‘L’ and the speeds of the two trains are ‘V₁’ and ‘V₂’ respectively.
When the trains are moving in the opposite direction, their relative speed is the sum of their individual speeds. The total distance they need to cover is the sum of their lengths. Since they cross each other completely in 5 seconds, we can set up the following equation:
(V₁ + V₂) × 5 = 2L
When the trains are moving in the same direction, their relative speed is the difference between their individual speeds. The total distance they need to cover is the difference between their lengths. Since they cross each other completely in 15 seconds, we can set up the following equation:
(V₁ – V₂) × 15 = 2L
Now, let’s solve these equations to find the ratio of their speeds.
From the first equation, we have:
(V₁ + V₂) × 5 = 2L
V₁ + V₂ = (2L) / 5
From the second equation, we have:
(V₁ – V₂) × 15 = 2L
V₁ – V₂ = (2L) / 15
Let’s add these two equations together:
V₁ + V₂ + V₁ – V₂ = (2L) / 5 + (2L) / 15
2V₁ = (6L + 2L) / 15
2V₁ = (8L) / 15
V₁ = (4L) / 15
So, the speed of the first train is (4L) / 15.
Now, let’s substitute this value back into the first equation to find V₂:
(4L) / 15 + V₂ = (2L) / 5
V₂ = (2L) / 5 – (4L) / 15
V₂ = (6L – 4L) / 15
V₂ = (2L) / 15
Therefore, the speed of the second train is (2L) / 15.
The ratio of their speeds is given by:
(V₁ / V₂) = ((4L) / 15) / ((2L) / 15)
(V₁ / V₂) = 4L / 2L
(V₁ / V₂) = 2
So, the ratio of their speeds is 2:1.
28 hrs
previous ans wrong again..!!!!
first find x its 2 hours
total journey 6 hrs 3km up and also down
jill takes one hr to come down and jack takes 3 hrs so x
is 2 hours….
And while going up jack goes at 1.5km/hr and jill goes at
0.75 km hr so to travel 3 km they take 2 hrs and 4 hrs
respectively…!!! x again is 2 hrs…
so jack totally takes 5 hrs to travel 6 km
therfore speed is 6/5 km per hour
thats is 1.2 km per hour is the correct answer
B
Days taken by A to complete whole work= 140 days
Days taken by B to complete whole work= 105 days
A’s 1 day work= 1/140
B’s 1 day work= 1/105
On adding these together we get: 1/60 (1 day work by working together)
So, together they will be able to complete it in 60 days
125, 123, 120, 115, 108, 100, 84
b
C will get RS 95
Let’s say, length of train = x metres
Speed at pole = Speed at platform
x/15 = 100+x / 25
5x = 300 + 3x
2x = 300
x = 150m
So, train is 150 metres long.
find out what is the problem and taking the bad out always works.
1km is equal to 1000 meter
Therefore 225 meter is how many km
Then we have to cross multiply
1km – 1000 meter
? – 225 meter
0.225 km
Then we have to apply formula
Speed = Distance/Time
Speed = 0.225/12 sec
= 0.01875×3600sec
= 67.5
Therefore speed of train is = 67.5