1, 2, 4, 8, 16, 32, 64, (…..), 256
128
say the work is w and let no of days taken by b is ‘x’ which
we have to calculate
so work done by a in one day is w/6
work done by b in one day is w/x
a and b together can do work in 4 days ie=(w/6)+(w/x)=(w/4)
solving equation x=12
so no of days taken by b=12
answer can be 1,2,3,4 can’t be determined exact number
just explaining a case:
there are 10 people in the party.
name of people no. of people with they made handshake list of those people(this can vary but showing the possibility)
1 1 9
2 2 8, 9
3 3 7, 8, 9
4 4 6, 7, 8, 9
5 5 6, 7, 8, 9. 10
6 6 4, 5, 7, 8, 9, 10
7 7 3, 4, 5, 6, 8, 9, 10
8 8 2, 3, 4, 5, 6, 7, 9, 10
9 9 1, 2, 3, 4, 5, 6, 7, 8, 10
10 4 5, 6, 7, 8, 9
jack got 9 different answer so jack can be either 4th number or 10th number and jack’s wife know jack very well so she can’t have handshake with jack so if 4th is jack then she can’t be handshake with 6,7,8,9, in this case she can be 1,2,3, 5, 10 and now depending upon which no is jack’s wife she can have hand shake with- 1- 4 people, and if jack is number 10 then she can’t be 5,6,7,8,9 so again depending upon her number she can handshake with people in range of 1-4
(x-2)^3==x^3-6x^2+12x-8
(x-2)^3==(2^(2/3)+2^(1/3))^3
therefore,by solving
Ans: x^3-6x^2+x== -8-5*2^(2/3)-5*2^(1/3)
Cake is never cut in such a way.
Wat we can do is.
1st cut should be cutting the Cake into two Halfs
Now put one half on top of other. Then again cutting it like
we made the 1st cut.
so now 4 parts. Two on top two on below.
Now Cut the cake in the orthogonal direction than the
earlier two cuts.
The trick was only That u can put one half on top of other.
Tats it.
madras
thanks
75%