37 SEATS….
because if passengers will occupy 3 seats, per head amount
payable will be 26.89.80.67 can not be divisible other than
3 and 26.89. so the,
Number of occupied seats will be 3
Number of unoccupied seats will be 40-3=37
Servlets are faster as compared to JSP, as they have a short response time.
JSP is slower than Servlets – JSP is a HTML-based codes.
Servlets are harder to code, as here, the HTML codes are written in Java – JSPs are easier to code, as here Java is coded in HTML.
In an MVC architecture, Servlets act as the controllers. – In MVC architectures, the JSPs act as a view to present the output to the users.
The service() function can be overridden in Servlets. – The service() function cannot be overridden in JSPs.
LET ACTUAL PRICE BE 100 RS(FOR CONVINIENCE)
THEREFORE IF PRICE IS CUT BY 20%
THEREFORE NEW PRICE=100-20=80 RS
THEREFORE WE NEED TO ADD X% TO 80 RS TO MAKE IT 20 RS AND ADD IT TO 80 TO MAKE IT 100RS
THEREFORE, 80X/100 = 20
I.E. 4X/5=20
THEREFORE x=20*5/4
=5*5
=25
HENCE 25% OF PRICE SHOULD BE ADDED TO MAKE THE PRICE EQUAL TO THE ACTUAL PRICE.
Solution # 15-18
Sitting solution be- D T M B H R
Ans 15 :Mr. D
ans 16 : 1 2 3
Ans 17 : 3
Ans 18 : Mr B Suffering from anemia.
ans is C.
let H be present age of husaband.W be present age of wife.
H+W=91.
now let diff between their ages be x.that is H-W=x.
now when husband is W yaers old, his wife must be W-x years
old.and it is given that H=2(W-x). so 2W-H=2x. and H-
W=x.eliminating x we get 4W=3H. but H+W=91, so solving thse
two H=52 W=39.
2* pi* r ( h + r )
r=3cm
h=7cm
2 * 22/7 *7 ( 10 ) = 440 sq cm
Karnataka
The answer is A)
y1 = 62 Rs/kg
y2 = 72 Rs/kg
y = 64.5 Rs/kg
y2 – y1 = 10 Rs/kg
The distance between the y and y1 is
y – y1 = 64.5 – 62 = 2.5
x1 = (y – y1)/(y2 – y1) = 2.5/10 = 0.25
x2 = 1 – x1 = 1 – 0.25 = 0.75
The target price is calculated by the lever method.
x1 * y2 + x2 * y1 = 0.25 * 72 + 0.75 * 62.5 = 64.5
The ratio is of y1 to y2 is
0.75 : 0.25
Divide by both by 0.25
3 : 1
let the total work to be done =1
so a+b+c=1 (say)
then a and b are supposed to do 7/11 th of work
so c= 1- (7/11)
c=4/11
therefore c gets (4/11)*550
=200 is the answer
it was a friday.
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
Here is the solution to the given version of the puzzle (9 balls, one is heavier, need to identify oddball), where we label the balls A, B, …, I:
1. Weigh ABC versus DEF.
Scenario a: If these (1) balance, then we know the oddball is one of G, H, I.
2. Weigh G versus H.
Scenario a.i: If these (2) balance, the oddball is I.
Scenario a.ii: If these (2) do not balance, the heavier one is the oddball.
Scenario b: If these (1) do not balance, then the oddball is on the heavier side. For simplicity, assume the ABC side is heavier, so the oddball is one of A, B, C.
2. Weigh A versus B.
Scenario b.i: If these (2) balance, the oddball is C.
Scenario b.ii: If these (2) do not balance, the heavier one is the oddball.
answer is maximum of 2.
time = distance / speed
speed = 36*(5/18) m/s=10m/s
distance = 100m
time=100/10s = 10sec
8
= 100 + 100 = 200 m
Time taken by train = 10 sec.
∵ Speed = Distance/Time
⇒ Speed of train = 200/10 = 20 m/sec.
∴ Speed of train = 20 × 18/5 = 72 kmph.
In question they left 10 seconds
( d ) 6 days