64
1/x=1/5+1/10+1/30=lcm is 30.
->30/5=6
->30/10=3
->30/30=1
1/x=6+3+1=10
1/x=10/30=1/3=x=3
Ans is 3 hr.
Ans = 8
Use simple box method
[1][2][2][2]= 1x2x2x2 =8
Logic >
once place have 2 number (2,6)
Tens place have also 2 number (7,3)
So that number is divisible by 4
Now, 2 numbers fixed at once and tens place left 2 numbers which is choice at hundredth place
Now 3 number fix left 1 number which is placed at thousands place
Total number form is 4×4 = 16
But divisible by 4 is 1x2x2x2 =8
X filling rate is 1/18 or 4/72 per hour
Y filling rate is 1/24 or 3/72 per hour
Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence
72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72
So at 20.5 hours with X turn filling is 100% complete with 72/72
Answer: It will take 20.5 hours to completely fill this tank.
Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share
360
C. 20
39/50
pass English =80%
fail=100-80=20%
pass Math = 70%
fail in Math=100-70=30%
fail in both=10%
total fail students= fail in Eng+fail in Math-common
= 20+30-10=40%
if 40% fail then 60% will pass
let total students=x
hence
60% 0f (total students)=144
60/100 of (x)= 144
x=(144×100)/60
X=240
total students=240
The numbers that lie between 100 and 1000 which are divisible by 14 are 112, 126,140 …,994
a = 112; l = 994, d = 14
n= (l−a)/d+1
= (994-112)/14+1
= 64
Sn=n/2(l+a)
= 64/2(994+112)
= 32*1106
= 35392
Ans :15
X be a present age of mudit
After 18 year age of mudit is X+18
4 year ago age was X-4
As per question,
X+18=3(X-4)
X+18=3X-12
3X-X=18+12
2X=30
X=15
Total 55
Manisha is a girl name so 54 boys
1 girl
I am not doing my money investment in conventional manner
data inadequate
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
0