19, 26, 33, 46, 59, 74, 91
Answer 33
Adding 7,9.13,15,17
Correct is 35
answer : 36 –Explaination:
X= Chickens
Y = Qty per day
X*Y*9= 12 *.9 *Y*30
x=36
Call from HR for interview in an unexpected time!
A’s speed=6 mph ,B’s speed=8 mph
Let, after x hrs, they will meet.
so, the distance traveled by A in x hrs should be the same as the distance traveled by B in (x-1/2)hrs [as B started the journey after 30 min of A]
Thus, 6x=8(x-1/2)[as distance=speed*time]
=>8x-6x=4
=>2x=4
=>x=2
after 2 hrs they will meet so time=(9+2)=11.00 a.m
Assume Q can do the work alone in Q days:
work of a day by both P and Q =>
(1/15) + (1/Q ) = 1/6
solving this Q = 10.
Relative speed =65-45km/hr
Relative speed=20km/hr
Convert to m/s
S=20*5/18
S=5.555
Length of the faster train =5.55555*18seconds
=100meters
3
1/24-1/40
(5-3)/120
2/120
1/60
60 minutes
cube root of 5 is 125 so 128 is nearer to 125 and hence 5+5+5=15 and the nearest answer amongst options is 17 so 17 is correct answer:) yipppy……..
(x**2 – 6* x + 5) = (x-1)*(x-5)
(x**2 + 2 * x + 1) = (x + 1) * (x+1) = (x+1)**2
For what x is (x-1)*(x-5)/( (x+1)**2) a minimum?
One way to answer this question is by using calculus.
Take the derivative, and set to zero.
Since this is a fraction of polynomials, and a fraction is
zero only if it’s numerator is zero, we need calculate only
the numerator of the derivative and set it to zero.
The numerator of the
Derivative of (x-1)*(x-5)/( (x+1)**2) is
( (x-1) + (x-5) ) ( x+1)**2 – (x-1)(x-5)( 2 (x+1) )
= (2 x – 6) (x+1)**2 – (2) (x-1)(x-5) (x+1)
= 0
Divide through by 2 (x+1)
(x-3)(x+1) – (x-1)(x-5) = 0
(x**2 – 2 x – 3 ) – (x**2 – 6 x + 5) = 0
x**2 – x**2 – 2 x + 6 x – 3 – 5 = 0
4 x – 8 = 0
x = 2
Plugging in x = 2 into the original
(x**2-6*x+5)/(x**2+2*x+1)
gives us (2**2 – 6 * 2 + 5)/(2**2 + 2*2 + 1)
= (4 – 12 + 5) / (4 + 4 + 1) = -3/9 = -1/3
Least value is -1/3
(x+2)^2 -x^2 = 84
X=20
So (20,22)
Sum= 42
5/9
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.