17 secs
At 130 years.
Let’s say,
I have x coins of 50 paise and (80-x) coins of 100 paise,so the equation is like this ,
50x + (80-x)*100 = 64*100
x = 32
So ,I have 32 coins of 50 paise
Sum of all numbers in series= 870 (I.e 312+162+132+142+122)
Average=sum of numbers/count of numbers
Average= 870/5
= 174
A perfect square is a square number of a digit. eg 64 is a perfect number, a square of 8
Now digits AB9 is a square number of a number.
AB9 Can also be written as A multiply by B multiply by 9
Get the Square root of AB9
Assumption, A=1, B=1
1*1=1=A, 1*1=1=B Therefore,
Square root of A = A, B = B and 9=3
Therefore
An odd number is a number indivisible by 2.
for example 1,3,5,7…….
Therefore Squares A*B*9= AB9
Where a=1, b=1, 3 as digits.
Conclusion
A=1 is an odd number
i am looking for a cyber security expert job
0.000256
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Relative speed = 60 + 90 = 150 km/hr.
= 150 x 5/18 = 125/3 m/sec.
Distance covered = 1.10 + 0.9 = 2 km = 2000 m.
Required time = 2000 x 3/125 = 48 sec.
I would say everyone has blind spots, and i would too. And that is why I believe in teamwork because when you are a team, you can point out other people’s blind spots and they will do the same for you.