Ques:- A can do a job in 18 days and B can do it in 30 days. A and B working together will finish twice the amount of work in ——- days?
Ques:- 100 glasses are there. A servant has to supply glasses to a person If he supplies the glasses without any damage he will get 3 paise otherwise he will loose 3 paise. At the end of supplying 100 glasses if he gets 270 paise, how many glasses were supplied safely.
Recent Answer :
: Suppose that x glassses are supplied safely , therefore
(100-x) glases are damage. Then equation is :
3x – 3(100-x) = 270
on solving this equation value of x comes out to be 95.
Ques:- If the list price of a book is reduced by Rs. 5, then a person can buy 5 more books for Rs. 300. The original cost of the book is?
Recent Answer :
: 20- buy 15 books
15- buy 20 books
Original price is 20.
Ques:- You have not done your PG yet. This is not a drawback, but don’t you think you should get a PG degree asap?
Ques:- All natural numbers and 0 are called the _____ numbers.
A. whole
B. rational
C. integer
D. prime
Recent Answer :
: A
Ques:- What is your goal and how it will help our organization?
Ques:- What does “customer care service” mean to you?
Ques:- A power unit is there by the bank of the river of 900 mtrwidth. a cable is made from power unit to power a plantopposite to that of the river and 3000 mtr away from thepower unit. The cost of the cable bellows water Rs5 / mtrand cost of cable on the bank is Rs 4/ mtr. Find the totalof laying the cable.
Recent Answer :
: 2100
Ques:- Gavaskar's average in his first 50 innings was 50. After the 51st innings, his average was 51. How many runs did he score in his 51st innings. (supposing that he lost his wicket in his 51st innings)
Ques:- Rate your self in ASP.NET
Ques:- What was your work profile ?
Ques:- The average age 9 members of a committee are the same as it was 2 years ago, because an old number has been replaced by a younger number. Find how much younger is the new member than the old number?
Ques:- c=a/b ; a-1=c What is the relation between a&b
Recent Answer :
: c=a/b
c=a-1
=>b=a/c
=>b=a/a-1
Ques:- Do you know what is your job profile?
Ques:- What is a percent of b divided by b percent of a?
Ques:- Afte done your graduation. how long time you spent. what did you do in this time?
Ques:- All about my past experience
Ques:- Draw three concentric circles with a line passing through their centers without lifting your hand.
Ques:- How can i work when i join the company
Ques:- Pipe A can fill in 20 minutes and Pipe B in 30 minsand Pipe C canempty the same in 40 mins.If all of them worktogether, find the timetaken to fill the tank
Ques:- How to make operation smooth?
Ques:- Can you come up with a 60 day goal plan ?
Ques:- 12.05 x 5.4 ? 0.6 = ?
Recent Answer :
: =12.05×5.4/0.6
=12.05×9.0
=108.45
Ques:- What are the time bound deliveries?
Ques:- What is difference between psu n central govt employee?
Ques:- A boy travels in a scooter. After covering 2/3rd of the distance, the wheel got punctured. He covered the remaining distance by walking. Walking time is twice of the time taken in scooter. How many times the riding speed is of the walking speed?…
Ques:- How many person live in your family?
Ques:- What has been your greatest failure?
Ques:- One student takes 20 mins to reach school if he goes at a speed of 15kmph .At what speed should he go to reach in 15 mins ?
Recent Answer :
: 1) time =20mins,speed=15kmph=15*(5/18)=25/6 m/sec
distance=20*(25/6)=250/3 m
then 2) given as time =15min
speed=250/3*15=(50/9)*(18/5)kmph=20kmph
Ques:- if a car starts from A towards B with some velocity due to some problem in the engine afetr travelling 30 km .if the car goes 4/5 th of its of actual velociteythe car reaches B 45 min later to the actual time.if the car engine fails after travelling 45km the car reaches the destination B 36min late to the actual time ,wat is the initial velocity of car and what is the distance between A and B on km.
Recent Answer :
: 20&130
A & B one day work= 1/18 + 1/30= 8/90
As we know that number of work is 1
1÷8/90= 1*90/8= 90/8.
Since they say “ twice the amount of work
Then ,2*90/8= 22.5 days