500
156
b
Bopri is farthest to the west followed by Kakran, Akram, Tokhada, and Paranda to the east.
there will be no banana left
1×2×…100=100!
Number of zeros in product of n numbers =[5n]+[52n]+[53n]+…
Number of zeros in product of 100 numbers =[5100]+[52100]+[53100]
where [.] is greatest integer function
=[20]+[4]+[0.8]=20+4=24
8, 27, 64, 100, 125, 216, 343
100
just will draw the line first and then draw three concentric circles
2380
assume the ratio 6:4 to be 60:40
boys taking lunch in canteen=60% of 60=36
Girls taking lunch in the canteen=40% of 40=16
Total boys and girls taking lunch in the canteen=52
Total students we assumed is 60+40=100
Therefore percentage of boys and girls taking lunch in the canteen=(52/100)*100=52%
4:3
A—–>B (first train)
B——>A(second train)
A/B=Srureroot((time to B)/(time to A))
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
( c ) 10
I will try to find that person
Or give that bag to police ..
x/2y=3/2…
therefore
2x=6y
x=3y
therefor
=21y+4y/3y-2y
=25y/y
=25..
there answer=25
so for the above question, we don’t have an option…so answer
is Data Insufficient..
Therefore, the number of possible 13 digit numbers using 1, 2, 3, 4, 5 which are divisible by 4
= x 3 + x 2
= (3 + 2)
=
= 244140625 ways