say the work is w and let no of days taken by b is ‘x’ which
we have to calculate
so work done by a in one day is w/6
work done by b in one day is w/x
a and b together can do work in 4 days ie=(w/6)+(w/x)=(w/4)
solving equation x=12
so no of days taken by b=12
option B
TCPEOSPR
u c 5 numbers…..
we add the combination of digits…..
a.17->1+7=8(even)
b.23->2+3=5(odd)!!!!!
c.37->3+7=10(even)
d.13->1+3=4(even)
e.73->7+3=10(even)
all combinations are even xept 23
ans:23
57 and 3
12 x 57 = 684
-8 x 3 = -24
684 – 24 = 660
660/ 60 = 11
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Answer:
Since the car has met the person 20 minutes before hand, it has actually saved 10 mins of journey (to and fro)
since the man has started 1.30 hrs before and car has met him 10 mins before actual time he takes to reach daily is 1hr and 20 mins
40358
60 more men
NON
The answer is A)
y1 = 62 Rs/kg
y2 = 72 Rs/kg
y = 64.5 Rs/kg
y2 – y1 = 10 Rs/kg
The distance between the y and y1 is
y – y1 = 64.5 – 62 = 2.5
x1 = (y – y1)/(y2 – y1) = 2.5/10 = 0.25
x2 = 1 – x1 = 1 – 0.25 = 0.75
The target price is calculated by the lever method.
x1 * y2 + x2 * y1 = 0.25 * 72 + 0.75 * 62.5 = 64.5
The ratio is of y1 to y2 is
0.75 : 0.25
Divide by both by 0.25
3 : 1
Let us consider previous salary as a ‘X’ then
0.12*X=0.10*(X+1200)
0.02X=120
X=120/.02=6000
X=6000
His previous salaray was 6000
124
The Answer is 3
ans is a