A parabola is a conic section.
So cut a cone obliquely.
10, 25, 56, 70, 85, 95, 125
56
12(1/3) = 4 so women = 4
==>men = 12-4 = 8
if team needs 20% of women then men Will be 80%
consider u want to hire “x” men
so,
(12+x)(80/100) = 8 + x
so, x= 8
no
1 ball – 4 runs (1st batter – 94+4=98)
2 ball – 3 runs and one run is short run during running between the wicket (1st batter- 98+3-1 =100)and strike changes for 2nd batter
3 ball – 6 runs ( 2nd batter 94+6=100)
Relative speed = 60 + 90 = 150 km/hr.
= 150 x 5/18 = 125/3 m/sec.
Distance covered = 1.10 + 0.9 = 2 km = 2000 m.
Required time = 2000 x 3/125 = 48 sec.
1.5 hr
B. 32%
2:3
Both simultaneously because sales is the revenue generation team which is necessary for the commercial growth of the company whereas customer loyalty is again important for a company to go for long-term growth which is why good and satisfactory customer experience is necessary.
60000
60 more men
In order to enhance my career, I asked my colleagues about my strength and weaknesses, the areas where I need to improve more, and acquired more knowledge from my superiors. I worked on my weaknesses to convert into a positive response.
8925
speed=mile/hour
.•. time taken to travel M miles is
So, time =distance/speed
=M/m/h
=Mh/m hrs
he removed one bolt in each three wheels
and fixed the bolts in stephiny wheel
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
heat loss from a surface can be reduced by polishing the surface coz polished surface is bad radiator and bad absorber of heat