36, 64, 81, 125, 169
4
Average = (1+2+3+4+5+6+7+8+9)/3
= 45/3 = 15
Every side will contain sum of 15.
1st side contains 8 and 7.
2nd side contains 9 and 6.
3rd side contains 1,2,3,4 and 5.
Ravi do a work in 30 days
Prakash do a work in 40days
then both work together 1/30+1/40=70/1200
then solve values 120/7 is 17(1/7) days
1 : 2
Speed = (45×518)m/sec=252m/sec
Total distance covered = (360+140) m = 500 m.
∴Required time= 500×225sec = 40 sec.
Remote Access Service
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
LNTKCHMF
7, 8, 18, 57, 228, 1165, 6996
Ans : 228
7
(7*1)+1=8
(8*2)+2=18
(18*3)+3=57
(57*4)+4=232 [ given 228 ] odd
(232*5)+5=1165
(1165*6)+6=6996
X filling rate is 1/18 or 4/72 per hour
Y filling rate is 1/24 or 3/72 per hour
Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence
72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72
So at 20.5 hours with X turn filling is 100% complete with 72/72
Answer: It will take 20.5 hours to completely fill this tank.
Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share
pass English =80%
fail=100-80=20%
pass Math = 70%
fail in Math=100-70=30%
fail in both=10%
total fail students= fail in Eng+fail in Math-common
= 20+30-10=40%
if 40% fail then 60% will pass
let total students=x
hence
60% 0f (total students)=144
60/100 of (x)= 144
x=(144×100)/60
X=240
total students=240
125