w(drown)
15/46
Diagonal of square=1.414* a, where a is side of square.
ans=1.414*20
ans=28.28
9
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
the ratio is 4 : 3
so -> let’s suppose a case where multiplying both sides for the same number, the sum of the result will be 28 …
4 * 4 = 16
4 * 3 = 12
16 + 12 = 28
in 8 years they will be respectvely 24 and 20
which is the same as 6/5
The ans is -20.
Solution:
A-1
B-2
C-3 D-4 …like wise till Z-26.
ELECTRICITY-5+12+5+3+20+18+9+3+9+20+25==129
GAS-7+1+9==27
ELECTRICITY-GAS=129-27-(Minus 2)=100
so
JACK-JILL=(10+1+3+11-(10+9+12+12)-(minus(2))==(-20)
22