a printer produced 176400 lines in 420 minutes
it produces 176400/420 lines per minute = 420
answer is : 420 lines per minutes
The answer is 42
ans: .1432 inch
1-3/4=1/4
1-1/12=11/12
1/8,1/4,11/12 are broken off
so
5/8
5/8/4
5*11/8/4/12
remaining .1432inch
130
520 = 26 * 20 = 2 * 13 * 22 * 5 = 23 * 13 * 5
Required smallest number = 2 * 13 * 5 = 130
130 is the smallest number which should be multiplied with 520 to make it a perfect square.
(0! + 0! + 0! + 0! + 0!)! = 120
Here ‘!’ symbol is used for factorial.
And 0! = 1
= (0! + 0! + 0! + 0! + 0!)!
= (1 + 1 + 1 + 1 + 1)!
= 5!
= 120
32,7
Ans. let x is distance from A to B
and y is initial speed.
30/y+(x-30)5/4y -x/y = 3/4
=> 4x-12y=120 —-(1).
45/y + (x-45)5/4y -x/y=3/5
=> 5x-12y=225 ——-(2).
From equ (1) and equ (2) we will get.
x=25 and y=105
so initial speed is 25 km/hr
and Distance From A to B is 105 km
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
$20
1.5 km/hour
just will draw the line first and then draw three concentric circles
644, 328, 164, 84, 44, 24, 14
D
FASHION= FOIHSAN
It is F-ASHIO-N to F-OIHSA-N.
So PROBLEM will be P-ROBLE-M,
the answer is PELBORM.
I believe it will be 30 km/hr
SI = PTR / 100
15
heat loss from a surface can be reduced by polishing the surface coz polished surface is bad radiator and bad absorber of heat