mausi
A will finish work in 8 days (4days with B and 4 days with C).
(x+2)+(x)+(x-2)
X+2+x+x-2=18
3x=18
X=6
The 3digit number is 864
360 years old
Nepo’s son age = x
Nepo’s age = 3x
Nepo’s father age = 2*3x + 40
x + 3x + 6x + 40 = 1240
10x = 1200
x = 120
Nepos age = 3* 120 = 360 years
Doug won the race
Explanation-
The ratio of steps covered by me, Doug, and Anne is = 6:7:8
Since Distance covered in Me 21 steps = Distance covered by Doug 24 steps = Distance covered by Anne 28 steps
LCM (21, 24, 28) = 168
For a distance of 168 units, the ratio of the distance covered in each step is;
= 8 : 7 : 6
Therefore the ratio of speeds is;
= 8×6: 7×7: 6×8
= 48 : 49 : 48
Here, the speed of the Doug is more than the speed of me and Anne
Hence, Doug won the race
put 1 red marble in one jar and all the rest (99) in the
other.
This gives you 50% from the first jar (if they pick that
jar they will get red 100% of the time). For the other jar
the chances are 49/99 or 49.494949%. Divide that by 2 and
its 24.7474%. Total odds are 50% plus 24.7474% = 74.7474%
we consider a round shape cake.then cut in 2 equal parts in cut into center and next you have to cut its side by center then you have to get 8 equal parts in 3 exact cut
119
Put switch 1 on and leave it on for 2 minutes, then switch it off.
Put switch 2 on and leave it on, then walk into the room.
If the light is on, the answer is switch 2.
If the light is off but the bulb is warm when you feel it, the answer is switch 1.
If the light is off and the bulb is cold when you feel it, the answer is switch 3.
A. 978626
1900
wake up guys and see modulo % can return only integer value.
So answer will be 1 and all other answers are wrong. You can
run your equation in C code and check the output.
Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft
Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.
Number of Fence post needed = 96/3 = 32
1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024
Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432
Total Cost = 432 + 1024 = 1456
as total 16 floors out of them 11 were rented to A and B company .So remaining floors are 5 and each floor is 12000s.ft
So remaining = 12000*5
=60000