- Sintheetaa Technologies (Coorgle Web Services) General Aptitude Interview Questions
- Sintheetaa Technologies (Coorgle Web Services) Trainee Interview Questions
- Sintheetaa Technologies (Coorgle Web Services) Personal Questions round Interview Questions
- Sintheetaa Technologies (Coorgle Web Services) HR Interview Questions
- Sintheetaa Technologies (Coorgle Web Services) Lead Interview Questions
Ans =18
Explanation:
Assume that initial there were 3*X bullets.
So they got X bullets each after division.
All of them shot 4 bullets. So now they have (X – 4)
bullets each.
But it is given that,after they shot 4 bullets each, total
number of bullets remaining is equal to the bullets each
had after division i.e. X
Therefore, the equation is
3 * (X – 4) = X
3 * X – 12 = X
2 * X = 12
X = 6
Therefore the total bullets before division is = 3 * X = 18
Let the revolutins made by bigger wheel is: x
then revolution by smaller wheel will be: x+10
Now, the distance covered by both wheels will be same.
So,
7(x+10)=9x
7x+70=9x
70=2x
35=x
so distance travelled=9*35=315
or 7*45=315
The correct ANS: option C
Tuesday
Product of two numbers = 1320
HCF = 6
LCM = x
Formula:
Product of two numbers =(HCF *LCM)
1320=(6*x)
x=1320/6
x=220
LCM Of the numbers is220
ans is C.
let H be present age of husaband.W be present age of wife.
H+W=91.
now let diff between their ages be x.that is H-W=x.
now when husband is W yaers old, his wife must be W-x years
old.and it is given that H=2(W-x). so 2W-H=2x. and H-
W=x.eliminating x we get 4W=3H. but H+W=91, so solving thse
two H=52 W=39.
1.26
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
190.85
Average = (1+2+3+4+5+6+7+8+9)/3
= 45/3 = 15
Every side will contain sum of 15.
1st side contains 8 and 7.
2nd side contains 9 and 6.
3rd side contains 1,2,3,4 and 5.
RABBIT