say the work is w and let no of days taken by b is ‘x’ which
we have to calculate
so work done by a in one day is w/6
work done by b in one day is w/x
a and b together can do work in 4 days ie=(w/6)+(w/x)=(w/4)
solving equation x=12
so no of days taken by b=12
i will drop a mail saying that can you pleaae meal me the the originals of the stregic plan
brother
Correct option is C)
Let be students are consider as child
Let the age of child added later be x years.
average age of 12 children =20 years
∴ Total age of 12 children =20×12=240 years
After one more child is added-
Average of 13 children =20−1=19 years
Average age of 13 children =
13
sum of 12 children+x
19=
13
240+x
⇒240+x=247
⇒x=247−240=7 years
Hence the age of child added later is 7 years.
4.5
The numbers that lie between 100 and 1000 which are divisible by 14 are 112, 126,140 …,994
a = 112; l = 994, d = 14
n= (l−a)/d+1
= (994-112)/14+1
= 64
Sn=n/2(l+a)
= 64/2(994+112)
= 32*1106
= 35392
3days
Let Suvarna, Tara, Uma and Vibha be S,T,U,V respectively
initially in the beginning each persons share be
V = x U = y T = z
S = w = (x+y+z+32) Reason: She has to double others share, so she should have each and everyone’s share and still should be left out with 32
after 1st Round of game
S loses and is out with 32 and doubles the others share
V = 2x U = 2y T = 2z
After 2nd Round of game
T loses and is out with 32 and doubles the others share
V = 4x U = 4y
This means T had 2z = 2x + 2y + 32
After 3rd round of game
U looses and is out with 32 and doubles others share
V = 8x
This means U initially has 4y = 4x + 32
In the end V = 8x = 32
Solving this we get x = 4, y = 12, z = 32 and w = 80
There fore Suvarna had highest share in the beginning
Train speed 90 km /h
1st we have to change in m/s. then 90*5/18=25m/s
Then d=speed*time
=25*10=250m train length
Length of train = 125Mtrs
Speed of man = 5Km/Hr
=(5*1000)/(1*3600)
=1.4M/s
Time taken for train to pass = 10s
Spd = D/T
Total Distance (Man distance+ Train Length)
#Distance covered by Man in 10s
D=Spd*T
= (1.4M/s*10s)
= 14Mtrs
#Train length = 125Mtrs
Total D = 14Mtrs + 125Mtrs
= 139Mtrs
Time taken = 10s
Sp = D/t
=139M/10s
=13.9M/s
a/g