7, 8, 18, 57, 228, 1165, 6996
let t = total no of students.. then
students who passed one or both subjects,
n(e U h) = n(e) + n(h) – n(e intersection h)
=> t = 0.8t + 0.7t – 144
=> t = 1.5t – 144
students who failed both subjects is 10% i.e. 0.1t
=>t-n(e U h) = 0.1t,
=>t -(1.5t – 144) = 0.1t
=>t- 1.5t- 0.1t = -144
=> -0.6t = -144
=>t = 240
( d ) Root
Let x and y be the two numbers. And x > y.
Then,
x + y = 80—–(1)
y=80-y
Also,
x = 4y – 5
Solving the two equations,
80 – y = 4y – 5
85 = 5y
Therefore, y = 17
put the value of y in equation(1)
then
x+y=80
x+17=80
x=63
the numbers are 17&63
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
(T-P)-(U-Q)-(V-R)-(W-S)
S Opposite is Q
U sits the P and Q
The last number should be 0.
and the rest of the number to be divisible by 8. The x should be 6
So, sum is 6.
Ans is 2(Prime numbers)
Sum of 5 consecutive nos is 35
so X + (X+1) + (X+2) + (X+3)+ (X+4) = 35
5X + 10 = 35
X = 5
So the 5 consecutive numbers are : 5, 6, 7, 8, 9
The Prime numbers are 5 and 7
B. 9001
@ Aprameya Shyam
length=x does not imply breadth=36-x
2x+4y=36.
3 possible answers are
(2,8) -> 16sqcm.
(4,7) -> 28sqcm.
(6,6) -> 36sqcm
MBA refers to Master Of Business application, so that the line says as well our day to day life is also consider as an business, and second by science stream but why not in other, it depends on the capacity of student and smart move kind off.
Ans : 228
7
(7*1)+1=8
(8*2)+2=18
(18*3)+3=57
(57*4)+4=232 [ given 228 ] odd
(232*5)+5=1165
(1165*6)+6=6996