Dice
democrate=1008
C
c
600
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Let A=5x,B=3x,C not given so consider C=x
In triangle total angle=180°
A+B+C=180°
5x+3x+x=180°
9x=180°
X=180°/9
X=20°
A=5(20)=100°
B=3(20)=60°
C=20°
Therefore A=100° is the largest angle
Ans: 100°
Day 1: 30-3ft = 27+2ft = 29
Day 8: 23 jumps 3ft = 20 slips 2ft = 22
Day 16: 13 jumps 3ft = 10 slips 2ft = 12
Day 24: 3 jumps 3ft = Out?
Its very simple..
consider the fraction of s in the mixture = 1/3
So if we add one more R the the fraction wil be = 1/4
Automaticaly S becomes 25% of the mixture