To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
( d ) Neeraj is taller than Nilesh
Grandma
10C3 = 120
let the total no of breads be x.
1st man 2nd man
x- (x/2) – 1/2 – 1/2((x-1)/2) – 1/2 ….. so on.
ans is 31.
first ate : 15.5 + .5 = 16 remaining 15
second ate : 7.5+0.5 = 8 remaining 7.
third ate : 3.5 +0.5 = 4 remaining 3.
fourth ate : 1.5 + 0.5 = 2 remaining 1
fifth ate : 0.5 + 0.5 = 1 remaining 0
100
BROTHER
Let’s say,
I have x coins of 50 paise and (80-x) coins of 100 paise,so the equation is like this ,
50x + (80-x)*100 = 64*100
x = 32
So ,I have 32 coins of 50 paise
No of men employed = N
No of days to finish the work = 9 days
No of men after increase = (N + 10)
No of days to finish the work = 6 days
Equating mandays
9N = (N+10)*6
9N — 6N = 60
3N = 60
N = 20
No of men employed = 20
5 (3+2)
if he wins then it becomes 4 double than 2
and if looses then opponent becomes 3 which is equal.
75%
ans=13.33
solution: (710/12)*8 – 460
c