A. 978626
Let cost for apple be a Cost for banana be b and Orange be c
So by first value expression becomes 17a + 13b + 9c =130 ———-1 therefore if you further solve a = (130 – 13b – 9c)/17 ———- 2 the second expression becomes: 13c + 7a + 10b = 100 ———- 3 If you put value of a in second expression it becomes: 13c + 7[(130 – 3b – 9c)/17] +10b = 100
Further if you solve you get value of b:
b = 10 – 2c ———-4
put value of b from 4 in 1
17a + 13 [10 – 2c] + 9c = 130
Further if you solve you find value of a
a = c ———-5
Put 5 in 3
13c + 7c + 10b = 100
further solve you get: c = 1 ———-6
from 5 and 6
a = c = 1 ———-7
Substitute value of c in expression 4
b = 10 – 2c b = 10 -2 * 1 b = 8 ———-8
therefore a + b + c = 10
Speed = (45×518)m/sec=252m/sec
Total distance covered = (360+140) m = 500 m.
∴Required time= 500×225sec = 40 sec.
7:8
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
20- buy 15 books
15- buy 20 books
Original price is 20.
p=5/6+5/16-5/6
both 5/6’s get cancelled.
so, p=5/16
p=0.3125, therefore (p-1)3 value is (0.3125-1)3= -0.6875*3
=-2.0625.
C)3
9000
Its very simple..
consider the fraction of s in the mixture = 1/3
So if we add one more R the the fraction wil be = 1/4
Automaticaly S becomes 25% of the mixture
21
Initially, potatoes have 99% water by weight ; which means they have 1% solid non-water content.
1% of 100 kg = 1 kg
Now even when they dehydrate,this 1kg solid mass remains constant.
It is given that finally, 98% is water by weight , which implies that 2% is non-water solid.
This means 2% of total weight = 1 kg
Total weight *2/100 = 1 kg
Therefore, total weight finally = 50 kg.
Statements :
Some kings are queens. All queens are beautiful.
Conclusions :
I. All kings are beautiful.
II. All queens are kings.
Conclusion 1 follows
Statements :
No man is a donkey. Rajesh is a man.
Conclusions :
I. Rajesh is not a donkey.
II. All men are not Rajesh.
E
if initially the price was Re 1.the new price nw bcoms to b
0.7..
so ,if the price z 0.7 ,the increment required is 0.3
so % in crement= 0.3/0.7*100=42.87…