A
7 1/2
1200*5 : 750*4
6000:3000
2:1
The answer cannot be determined as there is a particular formula where the consecutive numbers start.
first 10 odd num are 1,3,5,7,9,11,13,15,17,19
sum=100
avg=100/10
avg of 10 odd num =10
6, 13, 18, 25, 30, 37, 40
40
17and+-12=5-48=-43
let the average of 25 person be x
total age of a person=average×no.of person
total age of 25 person=X×25
=25X
when a new person of 46kg come average decrease by 5kg(X-5)
Total age of 26 person =25x+46
Average age of 26 person=X-5
A/Q
.25X+46=26(X-5)
25X+46=26X-130
26X-25X=130+46
X =176
hence the av. of 25 person be 176kg
south east
79
X×x-x=272
X^2-x-272=0
(X-16) or (x-17)
X=16 or x=17
17^2-17=272
Answer Is 17
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
A can give B (5 min – 4 1/2 min) = 30 sec start.
The distance covered by B in 5 min = 1000 m.
Distance covered in 30 sec = (1000 * 30)/300 = 100 m.
A can give B 100m start.
Simple interest Formula:
A=P(1+rt)
Therefore,
815=P(1+3r)
P+3r=815
854=P(1+4r)
P+4r=854
Solve the sums using Elimination method.
P+4r=854
P+3r=815
r=39.
Toget Principal
P+4r=854
P+4*39=854
P=854-117
P=698