0237
Lets call the 5 litre jug as jug A and 3 litre jug as jug B. Now, follow the steps:
Fill jug A completely. Now it contains 5 litres.
Slowly pour the water from jug A to jug B until jug B is completely filled. Now, jug A contains 2 litres and jug B contains 3 litres.
Throw away the water in jug B so that it is completely empty. Now, jug A contains 2 litres and jug B is empty.
Transfer the water from jug A to jug B. Now, jug A is empty and jug B contains 2 litres.
Fill jug A completely. Now, jug A contains 5 litres and jug B contains 2 litres.
Transfer water from jug A to jug B until jug B is completely filled. Now, jug A contains 4 litres and jug B contains 3 litres.
Now you have 4 litres of water in jug A.
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
There should be 5(2+2+1) decimal places in the answer and the decimal place should end with 2(3*2*2=12) so the correct answer is a, no need for calculator. You can rule out all the other options because it does not satisfy this condition.
12
Its very simple..
consider the fraction of s in the mixture = 1/3
So if we add one more R the the fraction wil be = 1/4
Automaticaly S becomes 25% of the mixture
Ratio of diameters=1:2
Ratio of radius=1:2
Ratio of volumes=(4/3*3.14*r1^3)/(4/3*3.14*r2^3)
=r1^3/r2^3=1^3/2^3=1/8
I will reading IPad questions and Awsome
35Kg