- Mtc - manufacturing technology centre General Aptitude Interview Questions
- Mtc - manufacturing technology centre Trainee Interview Questions
- Mtc - manufacturing technology centre Personal Questions round Interview Questions
- Mtc - manufacturing technology centre HR Interview Questions
- Mtc - manufacturing technology centre Lead Interview Questions
n+p
– While the train is moving, the jogger will also be running in the same direction.
– for the head(engine) of the train to get to the current position of the jogger 240m away, it will take:
45km/hr => 12.5m/s => 240/12.5 = 19.2 seconds.
– But in the same period of time, the jogger will still be running and will have moved to a new location by: 9km/hr => 2.5m/s => 2.5 * 19.2 = 48m
To get to the new location at the speed of 12.5m/s will take the train:
48/12.5 = 3.84sec
In this additional time, the jogger will move forward by:
3.84 * 2.5 = 9.6m
at a speed of 12.5m/s, it will take the train less than a second to cover the additional 9.6m
If we add the distance the jogger will cover in 1 second to 9.6, it is still less than what the train can cover per second. let us see (9.6 + 2.5 = 12.1)
Therefore, the head of the train will pass the runner at approximately: 19.2 + 3.84 + 1 => 24.04 seconds.
For the train to completely pass the runner, it will need its whole length of 120m to be in front of the runner.
This will take an additional (9.6 + 2) seconds.
Therefore for the length of the train to be ahead of the runner it will take approx. 35.65 (24.04 + 9.6 + 2) seconds
x:y=18:11
B
Let numbers be 2x, 3x
Given: (2x)^3 + (3x)^3 = 945
8x^3 + 27x^3 = 945
x = 3
Difference between numbers = 3x – 2x = x
Hence difference = 3
15%
340
( d ) 6 days
Let cost for apple be a Cost for banana be b and Orange be c
So by first value expression becomes 17a + 13b + 9c =130 ———-1 therefore if you further solve a = (130 – 13b – 9c)/17 ———- 2 the second expression becomes: 13c + 7a + 10b = 100 ———- 3 If you put value of a in second expression it becomes: 13c + 7[(130 – 3b – 9c)/17] +10b = 100
Further if you solve you get value of b:
b = 10 – 2c ———-4
put value of b from 4 in 1
17a + 13 [10 – 2c] + 9c = 130
Further if you solve you find value of a
a = c ———-5
Put 5 in 3
13c + 7c + 10b = 100
further solve you get: c = 1 ———-6
from 5 and 6
a = c = 1 ———-7
Substitute value of c in expression 4
b = 10 – 2c b = 10 -2 * 1 b = 8 ———-8
therefore a + b + c = 10
no
Servlets are faster as compared to JSP, as they have a short response time.
JSP is slower than Servlets – JSP is a HTML-based codes.
Servlets are harder to code, as here, the HTML codes are written in Java – JSPs are easier to code, as here Java is coded in HTML.
In an MVC architecture, Servlets act as the controllers. – In MVC architectures, the JSPs act as a view to present the output to the users.
The service() function can be overridden in Servlets. – The service() function cannot be overridden in JSPs.
choosing my career path
20/- per day
So, if he work one day
So,1*20=20
1/3*20=20/3
2/3*20=40/3
1/8*20=5/2
3/4*20=15
so,
20+20/3+40/3+5/2+15=57.5
So ans is 57.5 is the ans
option 5
to find the root of f(x) = 0;
Hi frnds I think U got wrong,
It was said that 4 ends not 4 corners
Here Ends are sides
So there is no way of extending a side
So the answer is incresing the depth