suppose
pipe:
A -30 hours A’s effeciency (60/30) =2
60( lcm of 30 and 20)
B- 20 hours B’s effeciency (60/20)=3
time taken by both to fill = 60/5 =12 as given in question (effeciencies of both a+b =2+3=5)
time taken by faster pipe i.e b = 60/3 =20
bank of calcutta originated in 1806
there is another answer such as
bank of hindustan
Initially, potatoes have 99% water by weight ; which means they have 1% solid non-water content.
1% of 100 kg = 1 kg
Now even when they dehydrate,this 1kg solid mass remains constant.
It is given that finally, 98% is water by weight , which implies that 2% is non-water solid.
This means 2% of total weight = 1 kg
Total weight *2/100 = 1 kg
Therefore, total weight finally = 50 kg.
1, 2, 4, 13, 31, 112,?
This series is written in base 5 numbers for decimal nos of 1,2,4,8,16,32,64
so next number is 224 .
224 in base 5 = 64 in base 10.
so 224 is next number.
1 – (-1) = 1 +1 = 2
B. 437950
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
speed = distance / time.
240/16=15m/sec=54km/hr
Monday
7days for a week so 62÷7 remainder is 6 so
After Tuesday + 6days = monday
x-28=(1/3)x
x= 42
50 %of 42 = 21