C is grand child of A
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
w, l=2w , area of square =8^2 = 64
area of rectangle = l*b
so w*2w = 8*64
w=16
length = 32
Initially, potatoes have 99% water by weight ; which means they have 1% solid non-water content.
1% of 100 kg = 1 kg
Now even when they dehydrate,this 1kg solid mass remains constant.
It is given that finally, 98% is water by weight , which implies that 2% is non-water solid.
This means 2% of total weight = 1 kg
Total weight *2/100 = 1 kg
Therefore, total weight finally = 50 kg.
21
mr, blue was compplete the contract in 12 days
Ravi do a work in 30 days
Prakash do a work in 40days
then both work together 1/30+1/40=70/1200
then solve values 120/7 is 17(1/7) days
D
if am standing on a ballconi so i see the people what they
are doing and how they are handling with the people and
what they are taking to each and everybody.
A will finish work in 8 days (4days with B and 4 days with C).
South-West
( d ) Root
x/2y=3/2…
therefore
2x=6y
x=3y
therefor
=21y+4y/3y-2y
=25y/y
=25..
there answer=25
so for the above question, we don’t have an option…so answer
is Data Insufficient..