Let ‘x’ be the number of perons in the group and let ‘y’ be
amount per head which they have to pay.
Then xy = 2400.
or y = 2400/x
Since two friends have forget the purse, x-2 persons should
share the total amount(2400).
If they share, they have to make an extra contribution of
Rs 100 to pay up the bill
That is x-2 persons should pay y+100 each
or (x-2)(y+100) = 2400
or y+100 = 2400/(x-2)
or y = 2400/(x-2) – 100
Therefore we have got two equations namely,
y= 2400/x and y = 2400/(x-2) – 100
Comparing these two, we get
2400/x = 2400/(x-2) – 100
Solving this we get
x^2 – 2x -48 = 0
or (x-8) (x+6) = 0
or x = 8 or x = -6
Since ‘x’ denote the number of persons, it should be
positive.
So, x = 8.
x-28=(1/3)x
x= 42
50 %of 42 = 21
9936
189
area is given by Area of Rectangle = Length of Rectangle*(sqrt((Diagonal of Rectangle^2)-(Length of Rectangle^2)))
so substituting we get area=4*(sqrt((25-16)))
area=4*(sqrt(9))
since area cannot be negative hence we take sqrt of 9 as 3 (as sqrt of 9 is 3 and -3 as well)
area=4*3=12m^2
Solution # 15-18
Sitting solution be- D T M B H R
Ans 15 :Mr. D
ans 16 : 1 2 3
Ans 17 : 3
Ans 18 : Mr B Suffering from anemia.
60*5/18*9=150
Let the firt number be n,
The largest number will be n+1
Their sum
n+n+1=55
2n+1=55
2n=54
n=27
Largest number =27+1=28
50 paise coins= 400 = Rs 200
20 paise coins = 600 = Rs 120
10 paise coins= 800 = Rs 80
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
2hr 30min
Fathers before age=3*before sons age—-(1)
After 2.5 years..
Fathers before age+2.5 years =2.5*sons age—-(2)
Substitute (1) in (2),
3*sons before age+2.5 years=2.5*sons age
0.5*sons age=2.5 years
Sons before age=5years
So current age after 2.5 years,
Sons before age+2.5 =5+2.5=7.5 years
1052
36,20