IQuest Interview Questions, Process, and Tips

Ques:- A person can row at 9 kmph and still water. He takes 4 1/2 hours to row from A to B and back. What is the distance between A and B if the speed of the stream is 1 kmph?
Ques:- Reasons for doing mba ?
Ques:- Who is the present Chairperson of the National Human Rights Commission (NHRC) ?
Ques:- What will be the growth rate after you join?
Ques:- What things about your last job that you found most difficult to do?
Ques:- What is the largest 8 digit prime number?
Recent Answer : Added by Ankit kumar On 2023-05-28 09:54:55:

9999991 (6k+_1) form

Ques:- What would you like to do five years from now?
Ques:- There are 9 coins. 8 are of 1 gm and 1 is of 2 grams. How will you find out the heavier coin in minimum number of weighing and how many weighing it will need?
Ques:- An equilateral triangle of sides 3 inch each is given. How many equilateral triangles of side 1 inch can be formed from it?
Ques:- Why don i want to apply for the job
Ques:- What are your achievements in life?
Ques:- Tell about your personal details?
Ques:- Educational Qualifications,work experience,Achievements done with pat companies worked with.
Ques:- Three numbers are in the ratio 2:3:4 and their product is 1536. what is the Largest number of these numbers?
Recent Answer : Added by Supriya p On 2022-09-28 17:42:55:

16

Ques:- what are the things to be studied for the post of Executive trainee in Hindustan Latex Ltd.?
Ques:- A speed of 14 metres per second is the same as
A. 28 km/hr
B. 50.4 km/hr
C. 70 km/hr
D. 74.2 km/hr
Recent Answer : Added by M KISHORE On 2023-03-15 16:31:05:

let convert meter to kilometer by multiply 18/5 then answer be 14*(18/5)=50.4 km/s

Ques:- What is your current package?
Ques:- Two pipes can fill a tank in 20 and 24 minutes respectively and a waste pipe can empty 3 gallons per minute. All the three pipes working together can fill the tank in 15 minutes. The capacity of the tank is?
Ques:- A man rows his boat 85 km downstream and 45 km upstream, taking 2 1/2 hours each time. Find the speed of the stream?
Recent Answer : Added by Peter Chibam Ebo On 2022-04-29 14:25:18:

325

Ques:- The difference between the local value and face value of 7 in the numeral 657903 is
A. 901
B. 903
C. 6993
D. 7896
Recent Answer : Added by trupti sharma On 2022-01-16 17:20:41:

c

Ques:- A cylindrical container has a radius of eight inches with a height of three inches. Compute how many inches should be added to either the radius or height to give the same increase involume?
Ques:- What where the things you have done in your College days?
Ques:- In how much time will a train of length 100 m, moving at 36 kmph cross an electric pole?
Recent Answer : Added by JAQ On 2021-06-21 17:40:13:

time = distance / speed
speed = 36*(5/18) m/s=10m/s
distance = 100m
time=100/10s = 10sec

Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- The length of the bridge, which a train 130 m long and traveling at 45 km/hr can cross in 30 sec is?
Ques:- What good books have you read lately?
Ques:- A prime number N, in the range 10 to 50 remains unchanged when its digits are reversed. The square of such a number is
A. 1936
B. 1089
C. 484
D. 121
Recent Answer : Added by Killer On 2022-08-14 16:39:48:

121

Ques:- Complete the following series.
9, 11, 15, 23, 39, ?
A. 42
B. 56
C. 64
D. 71
Recent Answer : Added by Aakash P S On 2022-08-24 17:03:41:

71

Ques:- How many numbers up to 100 are divisible by 7?
Recent Answer : Added by DK BOSS On 2021-07-30 16:27:11:

divide 100 by 7, and you get 14.28. (Obviously you aren’t talking about decimals here) and so 14 numbers can be divisible by 7 up to 100.

The answer is 14.

Ques:- There is a whole number n for which the following holds: if you put a 4 at the end of n, and multiply the number you get in that way by 4, the result is equal to the number you get if you put a 4 in front of n. In other words, we are looking for the number you can put on the dots in the following equation: 4… = 4 ?…4 Which number must be put on the dots to get a correct equation?

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top