Question is not completed
The letters A, B, C, D, E, F and G, not necessarily in that order, stand for seven consecutive integers from 1 to 10
D is 3 less than A
B is the middle term
F is as much less than B as C is greater than D
G is greater than F
1. The fifth integer is
(a) A
(b) C
(c) D
(d) E
(e) F
ans:a
2.A is as much greater than F as which integer is
less than G
(a) A
(b) B
(c) C
(d) D
(e) E
ans:a
3. If A = 7, the sum of E and G is
(a) 8
(b) 10
(c) 12
(d) 14
(e) 16
4. An integer T is as much greater than C as C is
greater than E. T
can be written as A + E. What is D?
(a) 2
(b) 3
(c) 4
(d) 5
(e) Cannot be determined
ans:a
pass English =80%
fail=100-80=20%
pass Math = 70%
fail in Math=100-70=30%
fail in both=10%
total fail students= fail in Eng+fail in Math-common
= 20+30-10=40%
if 40% fail then 60% will pass
let total students=x
hence
60% 0f (total students)=144
60/100 of (x)= 144
x=(144×100)/60
X=240
total students=240
it was a friday.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
The answer is A)
y1 = 62 Rs/kg
y2 = 72 Rs/kg
y = 64.5 Rs/kg
y2 – y1 = 10 Rs/kg
The distance between the y and y1 is
y – y1 = 64.5 – 62 = 2.5
x1 = (y – y1)/(y2 – y1) = 2.5/10 = 0.25
x2 = 1 – x1 = 1 – 0.25 = 0.75
The target price is calculated by the lever method.
x1 * y2 + x2 * y1 = 0.25 * 72 + 0.75 * 62.5 = 64.5
The ratio is of y1 to y2 is
0.75 : 0.25
Divide by both by 0.25
3 : 1
option 5
400
2
10.66 kmph
4500 sal of jan
A, b