s=36kmph
in meter per second is=36*5/18=>10
X filling rate is 1/18 or 4/72 per hour
Y filling rate is 1/24 or 3/72 per hour
Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence
72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72
So at 20.5 hours with X turn filling is 100% complete with 72/72
Answer: It will take 20.5 hours to completely fill this tank.
Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share
The probability that no one opens the door would be
0.5×0.5×0.5×0.5= 0.0625
So, the probability that atleast one opens the door is 1-0.0625= 0.9375
Sum of all numbers in series= 870 (I.e 312+162+132+142+122)
Average=sum of numbers/count of numbers
Average= 870/5
= 174
Mr. Brown painted the first whole house in 6 days plus 1/3 of the second house in the next 2 days. Mr. Black can paint a whole house in 8 days and had 8 days to work, so he painted the equivalent of 1 whole house. That accounts for 2-1/3 houses painted. Mr. Blue only needs to paint 2/3 of the last house, so 2/3 times 12 days equals 8 days.
Calculation:
⇒ If 1000 divided by 112, the remainder is 104. ⇒ 112 – 104 = 8 ⇒ If 8 is added to 1000 it will become the smallest four-digit number and a multiple of 112. ⇒ 1000 + 8 = 1008 ∴ The required result will be 1008.
i will drop a mail saying that can you pleaae meal me the the originals of the stregic plan
EALIME