- Ghaziabad precision products General Aptitude Interview Questions
- Ghaziabad precision products Trainee Interview Questions
- Ghaziabad precision products Personal Questions round Interview Questions
- Ghaziabad precision products HR Interview Questions
- Ghaziabad precision products Lead Interview Questions
16
E non of those
let A goes up and B comes down.
assume A takes 1 step in 1sec.
hence,B takes 5 steps in 1sec.
50 steps ll be moved by A in 50/1=50secs
125 steps ll be moved by B in 125/5=25 secs
hence speed of escalator=(difference of no of
steps)/(difference of time)
speed=(125-50)/(50-25)= 3 steps/sec
hence during upward journey of 50secs by A,total steps=50 by
A and 150 by escalator..total=150+50=200
during downward journey of 25 secs by B,total steps=125 by B
and 75 by escalator..total=125+75=200steps.
ANS:200 steps
15a=45
1^1,2^2,3^3,4:^4,5^5,6^6
1,4,27,256,3125,46656
b
1
6=1x2x3
24=2x3x4
60=3x4x5
120=4x5x6
210=5x6x7
336=6x7x8
12 month=>900Rs+Uniform
1month:75 => 9month:675
675-650=25 =>price of Uniform
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
1 ball – 4 runs (1st batter – 94+4=98)
2 ball – 3 runs and one run is short run during running between the wicket (1st batter- 98+3-1 =100)and strike changes for 2nd batter
3 ball – 6 runs ( 2nd batter 94+6=100)
10%
75%
NCPQJG