I can join your company with in one month that is my notice period time
No sentence can end with because because, because is a conjunction
CASE 1: First we should take six balls divided equally and
then it is placed on the two pans.three on one and three on
other..
if the two pans are balanced then the defective ball is not
in the six..then we should the two and keep them one ball
on each.
CASE2: Again We should take any of the six balls and
divided equally and then it is placed on the two pans.. if
any of the pan weighs less than the other.. We should take
the three balls seperately..Now from that three we should
take any two and placed one on each.. fi both the pan
balances the ball which is left over is the defective.. if
one ball weighes less than the other,while keeping one on
each,then it is the defective one….
10, 25, 56, 70, 85, 95, 125
56
( d ) 8404
Fuel to go = x + (x/4)=5x/4
Fuel to come = x
now,
x+(5x/4) = 4.5
9x/4 = 4.5
9x = 18
x = 2 (Fuel to comeup)
Fuel to go will be:
2+(2/4) = 2 + (0.5) = 2.5
B
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
240 m
30,40
35 is not the factor of 120 so…35 is the answer
he removed one bolt in each three wheels
and fixed the bolts in stephiny wheel