- Enterprise Engineering Services General Aptitude Interview Questions
- Enterprise Engineering Services Trainee Interview Questions
- Enterprise Engineering Services Personal Questions round Interview Questions
- Enterprise Engineering Services HR Interview Questions
- Enterprise Engineering Services Lead Interview Questions
8*1024+3*64+3
8192+192+3
8387
1000/0011/1000/0111
So ie 7. 1s here
((15 X m) + 23)/(m+1)= 16
solving , we get number of matches (m) as 7 (excluding last
match)
so he shud hit 39 runs in last innings to ake average to 18
Triveni Sangam of the river
Ganga, Yamuna, and Saraswati at Allahabad.
6084
7431 is largest number and 1347 is the least number from digits 1,3,4,7
so 7431-1347=6084
1920
slower train – 48 kmph = 40/3 m/s
say faster train, v m/s
therefore, {v-(40/3)}*180 = 600, => v= 60 kmph
1/6
let the total no of breads be x.
1st man 2nd man
x- (x/2) – 1/2 – 1/2((x-1)/2) – 1/2 ….. so on.
ans is 31.
first ate : 15.5 + .5 = 16 remaining 15
second ate : 7.5+0.5 = 8 remaining 7.
third ate : 3.5 +0.5 = 4 remaining 3.
fourth ate : 1.5 + 0.5 = 2 remaining 1
fifth ate : 0.5 + 0.5 = 1 remaining 0
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Divide 30*60 seconds by LCM of Numbers =15
( d ) Root