26
24.
exp: 0 is formed by multiplying 5 with 2. so first we find
how many 5’s and 2’s are there in 100!.
No of 5’s : 100/5=20/5=4/5.
20 +4 =24.
No of 2’s : 100/2=50/2=25/2=12/2=6/2=3/2=1/2.
50 +25 +12 +6 +3 +1.
It has 24 5’s and 2’s.
so the no. of zeros=24.
1%=50
12%=600
Let length of tunnel is x meter
Distance = 800+x meter
Time = 1 minute = 60 seconds
Speed = 78 km/hr = 78*5/18 m/s = 65/3 m/s
Distance = Speed*Time
=>800+x=653∗60=>800+x=20∗65=1300=>x=1300−800=500
ANSWER is ==> 1
1st step : 0.5
2nd step : 0.5+0.05 = 0.55
3rd step : 0.55+0.10 = 0.65
4th step : 0.65+0.15 = 0.8
5th step : 0.80+0.20 = 1.00
Daughter-in-law
Phillips
15 min 100 line
30 min 200 lines + 15 min rest total 45 min +5 min think +5 min write + 5 min rest
250 line code will be done
Placing three trees in triangle and placing the fourth tree in center
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
France — D
2cm b)
Bopri is farthest to the west followed by Kakran, Akram, Tokhada, and Paranda to the east.
1200*5 : 750*4
6000:3000
2:1