Blip Interview Questions, Process, and Tips

Ques:- How you are fit for this job?
Ques:- Two trains are moving in the same direction at 72 kmph and 36 kmph. The faster train crosses a man in the slower train in 27 seconds. Find the length of the faster train?
Recent Answer : Added by Atif On 2022-12-05 16:13:36:

10 x 27=270

Ques:- Whats position of work me job
Ques:- Some persons decide to raise Rs. 3 lakhs by equal contribution from each of them. If they contributed Rs. 50 extra each, the contribution increased to Rs. 3.25 lakhs. How many persons were there ?
A. 400
B. 500
C. 600
D. 700
E. None of these
Recent Answer : Added by BINDHU REDDY On 2021-08-09 01:51:48:

500

Ques:- What is your total experience?
Ques:- AT WHAT YOU ARE THE BEST ?
Ques:- What do you think about the Death Penalty?
Ques:- What would you do if you were invisible for a day?
Ques:- A man leaves a point P at 6 a.m. and reaches the point Q at 10 a.m. another man leaves the point give at 8 a.m. and reaches the point P at 12 noon. At what time do they meet?
Recent Answer : Added by Jilan Atef On 2021-02-24 17:31:36:

9 am

Ques:- Find the missing number of the series. 0.5, 0.55, 0.65, 0.8, ..
Recent Answer : Added by Ankit Aditya Mishra On 2022-05-17 09:07:22:

ANSWER is ==> 1

1st step : 0.5
2nd step : 0.5+0.05 = 0.55
3rd step : 0.55+0.10 = 0.65
4th step : 0.65+0.15 = 0.8
5th step : 0.80+0.20 = 1.00

Ques:- Side of rhombus is 5cm and sum of lengths of diagonals is 12cm. what is the area of rhombus?
Ques:- What is my goal in this industry?
Ques:- one rectangular plate with length 8inches,breadth 11 inches and 2 inches thickness is there.what is the length of the circular rod with diameter 8 inches and equal to volume of rectangular plate?
Recent Answer : Added by Admin On 2020-05-17 12:00:39:

volume of cylinder=volume of plane
pi*r*R*H=L*B*H
16PI*H=176
SO h= length=176/16*pi
ANser is 44pi

Ques:- When Seeta made necklaces of either 16 beads, 20 beads or 36 beads, not a single bead was left over. What could be the least number of beads Seeta had?
A. 700
B. 710
C. 720
D. 740
Recent Answer : Added by Hakeem Nazia Begum On 2022-09-22 16:40:07:

c

Ques:- If you have to start working at this project tomorrow, what would you do tonight
Ques:- What is the difference between hard work and smart work?
Ques:- What things give you greatest satisfaction?
Ques:- Why do you not join your family business
Ques:- Unix basics such as find, grep, pipes tees, wildcards, chmod.
Ques:- Explain the difference between group and team. Are you a team player?
Ques:- On which basis should be select you?
Ques:- Rearrange MERGANY
Recent Answer : Added by Admin On 2020-05-17 12:02:30:

GERMANY
Country Name..

Ques:- 3 runs required is 3 balls to win the match only on wicket left,the batsman is on 97 and runner on 98. how will both batsman score centuries as well as win the match?
Recent Answer : Added by Admin On 2022-09-27 18:46:51:

The batsman on 98 is on strike. He hits the ball and they run 3. UNFORTUNATELY one of the batsmen doesn`t turn correctly for one of the runs and the umpire calls ONE SHORT and awards only two runs. Therefore the first batsman has his century. There is now 1 ball remaining and one run is required to win. The batsman on strike, however is now the one on 97 runs. He now either hits a 4 or a 6. They win the game and both batsmen scored centuries.

Read more: 3 runs required in 3 balls to win with only a wicket left. The batsmen is on 98 and the runner is on 97. How will both the batsmen score centuries … – 3 runs required in 3 balls to win with only a wicket left. The batsmen is on 98 and the runner is on 97. How will both the batsmen score centuries as well win the match ?

Ques:- The ratio of two numbers is 2:3 and the sum of their cubes is 945. What is the difference of number ?
Recent Answer : Added by Preet On 2021-08-10 15:21:38:

Let numbers be 2x, 3x
Given: (2x)^3 + (3x)^3 = 945
8x^3 + 27x^3 = 945
x = 3
Difference between numbers = 3x – 2x = x
Hence difference = 3

Ques:- Past achievement, role in industry, reason of leaving.
Ques:- What would you do if a fellow executive on your own corporate level wasn?t pulling his/her weight?and this was hurting your department?
Ques:- How many numbers up to 100 are divisible by 7?
Recent Answer : Added by DK BOSS On 2021-07-30 16:27:11:

divide 100 by 7, and you get 14.28. (Obviously you aren’t talking about decimals here) and so 14 numbers can be divisible by 7 up to 100.

The answer is 14.

Ques:- If m, n, o, p and q are integers, then m(n + o) (p – q) must be even when which of the following is even?
A. m
B. n
C. m + n
D. n + p
Recent Answer : Added by narendra On 2022-09-18 09:02:13:

a

Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- How do you feel about working nights and weekends?

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top