600
0
= 100 + 100 = 200 m
Time taken by train = 10 sec.
∵ Speed = Distance/Time
⇒ Speed of train = 200/10 = 20 m/sec.
∴ Speed of train = 20 × 18/5 = 72 kmph.
In question they left 10 seconds
890.488
24 days
Answer is 33%
{35 % of all the employees are men.
so 65 % (100-35) of all the employees are women.
35*20%=7% of the men attended the annual company picnic and
65*40%=26% of the women attended the annual company picnic.
so 33%(7+26) of all the employeeswent to the picnic.}
speed = distance / time.
240/16=15m/sec=54km/hr
12
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Iron and steel
2
40
simple logic, Check Option Lets father present age = 40 so it full fill all condition like his son age become 10 and after five years it will become 15 and father age is 45 and it full fill second condition that fathers age is thrice as old as the son after 5 years
Question is not completed
The letters A, B, C, D, E, F and G, not necessarily in that order, stand for seven consecutive integers from 1 to 10
D is 3 less than A
B is the middle term
F is as much less than B as C is greater than D
G is greater than F
1. The fifth integer is
(a) A
(b) C
(c) D
(d) E
(e) F
ans:a
2.A is as much greater than F as which integer is
less than G
(a) A
(b) B
(c) C
(d) D
(e) E
ans:a
3. If A = 7, the sum of E and G is
(a) 8
(b) 10
(c) 12
(d) 14
(e) 16
4. An integer T is as much greater than C as C is
greater than E. T
can be written as A + E. What is D?
(a) 2
(b) 3
(c) 4
(d) 5
(e) Cannot be determined
ans:a
30+32+34+36+38+40+42+44+46+48=390..
0,8x= y
y – 0,7y = 270
y= 270 / 0,3
y=900
0,8x=900
x=1125
237.6 Kmh
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.