- Assured healthcare staffing llc General Aptitude Interview Questions
- Assured healthcare staffing llc Trainee Interview Questions
- Assured healthcare staffing llc Personal Questions round Interview Questions
- Assured healthcare staffing llc HR Interview Questions
- Assured healthcare staffing llc Lead Interview Questions
Business Process Outsourcing, or BPO, refers to the process of contracting standard business functions to be handled by a party outside of the company.
BPO is the abbreviation for business process outsourcing, which refers to when companies outsource business processes to a third-party (external) company.
16.25
= 100 + 100 = 200 m
Time taken by train = 10 sec.
∵ Speed = Distance/Time
⇒ Speed of train = 200/10 = 20 m/sec.
∴ Speed of train = 20 × 18/5 = 72 kmph.
In question they left 10 seconds
1/x
Gain=(profit/c.p)*100
Gain =selling price-cost price =900-675
=225.
Gain=(225/675)*100.
=33.3%
835, 734, 642, 751, 853, 981, 532
835,sum(digits)= 16
734 = 14
642=12
751= 13,
853=16,
981=18,
532=10
answer(c)751
D. 17 : 3
40
pages # figures
1000 1000 4
from 999 to 100 (999-99)*3 2700
from 99 to 10 (99-9)*2 180
from 9 to 1 (9-0)*1 9
total sum= 2893
Explanation:
They should share the profits in the ratio of their investments.
The ratio of the investments made by A and B =
6000 : 8000 => 3:4
let the third no be x ,
then the first no is 3x ,
second no is 2*3x ie 6x
average is (3x+6x+x )/3 = 20
10x/3 = 20
x= 60/10 = 6
third no is 6 , second is 6x = 36, first no is 3x = 18
largest no is 36 i.e second no
b
108
consider the tank capacity as 90 litres.
to fill the tank in 3 hrs first pipe must flow at a rate of 30 litres/hr
2nd pipe has to flow at a rate of 45 litres/hr
if two pipes are opened at a time the flow rate will become 75 litres/hr
90/75= 6/5 = 1.2= (i.e) 1hr and 12 minutes 1 1/5 hr
Since, there are 10 points on the circle and to draw a chord we need to connect any two points on the circle to make it a straight line, which implies that the number of chords = No of lines connecting any two points out of the 10 points
= 10C2 = 10*9/2 = 45 chords.
17.9