- Alalay sa kaunlaran (aski) incorporated General Aptitude Interview Questions
- Alalay sa kaunlaran (aski) incorporated Trainee Interview Questions
- Alalay sa kaunlaran (aski) incorporated Personal Questions round Interview Questions
- Alalay sa kaunlaran (aski) incorporated HR Interview Questions
- Alalay sa kaunlaran (aski) incorporated Lead Interview Questions
the capital of India is New Delhi
the capital of Pakistan is Islamabad
the ans is(b)Islamabad
The Answer is 3
The Answer is c
3606
Profit ratio will be : 4:5:6
5x=150
X=300
X share is 1200
Y share is 1800
Difference will be = x-y =600
option 5
Statements :
Some men are educated. Educated persons prefer small families.
Conclusions :
I. All small families are educated.
II. Some men prefer small families.
w, l=2w , area of square =8^2 = 64
area of rectangle = l*b
so w*2w = 8*64
w=16
length = 32
accountant trainee at thenational board of accountants and auditors
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
1km is equal to 1000 meter
Therefore 225 meter is how many km
Then we have to cross multiply
1km – 1000 meter
? – 225 meter
0.225 km
Then we have to apply formula
Speed = Distance/Time
Speed = 0.225/12 sec
= 0.01875×3600sec
= 67.5
Therefore speed of train is = 67.5
7 months
A, b
A. Christian Dior