0.18
385, 462, 572, 396, 427, 671, 264
427 is the answer
Because
385 means (3+5=8) or (8-3=5) ,
462 means (4+2=6) or (6-2=4) ,
572 means (5+2=7) or (7-5=2) ,
396 means (6+3=9) or (9-3=6) ,
671 means (6+1=7) or (7-6=1) ,
264 means (4+2=6) or (6-2=4) ,
but only 427 is the number in which if we do addition of any of its two digits (e.g 4+2 or 4+7) then its answer doesn’t come 3rd digit
like if we do 4+2 then answer will be 6 so the number should be 426 but it is not
or if we do 7-4 then answer will be 3 (not 2)
so the right answer is 427
2 and half day.
Marks in thrice in english as in science
so if science marks is x
then english marks = 3x
lets maths marks = y
ratio of english and maths marks is
3x/y = 3/5
=> y = 5x
and total marks = 162
3x + x + 5x = 162
x = 18 —-answer
If the bell rung when they r started is also counted then it
will be 5 otherwise 4
4
4/5
11 14
12 15
13 16
=======
14 17
the answers is 14
Ans = 8
Use simple box method
[1][2][2][2]= 1x2x2x2 =8
Logic >
once place have 2 number (2,6)
Tens place have also 2 number (7,3)
So that number is divisible by 4
Now, 2 numbers fixed at once and tens place left 2 numbers which is choice at hundredth place
Now 3 number fix left 1 number which is placed at thousands place
Total number form is 4×4 = 16
But divisible by 4 is 1x2x2x2 =8
perimeter of rectangle = 2(l+b)
given l abd b as 18 cm and 26 cm
therefore perimeter of rectangle = 2(44)
perimeter of circle = 2*pi*r
given 2*pi*r=2(l+B)
i.e, 2*(22/7)*r= 2(44)
(22/7)*r=44
r=14 cms
area of the circle = pi*r*r
=(22/7)*14*14
=616 sqcm is the answer
B. 3 : 2
4
find out what is the problem and taking the bad out always works.
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
Explanation:
They should share the profits in the ratio of their investments.
The ratio of the investments made by A and B =
6000 : 8000 => 3:4
25
65292