- Transamerica express logistics General Aptitude Interview Questions
- Transamerica express logistics Trainee Interview Questions
- Transamerica express logistics Personal Questions round Interview Questions
- Transamerica express logistics HR Interview Questions
- Transamerica express logistics Lead Interview Questions
I would design a voice integrated clock that reads out the time aloud whenever people ask for time
21
D = 180m
S = 42 – 6 = 36 * 5/18 = 10
T = D/S = 180/10
T = 18s
Let\: the\: total\: price \: be\: Rs. X\: then,
B= 2x/7 & A= \left ( x-2 \right )/7
So, A:B = 5x/7 : 2x/7 = 5 : 2
Let \: B’s \: capital\; be\: Rs.Y\: then\: \left ( 16000\ast 8 \right )/4y= 5/2
=> (16000\ast 8\ast 2)/(4\ast 5) = y
=> y = Rs. 12800
10 a.m.
Suppose the lengthier arm of weighing pan is of x cm and other arm is y cm .Also let weight if each melon be m kg.
so applying equilibrium of torque principles ,we get
case 1:-
1x-8my=0
case 2:-
2mx-1y=0
using case 1 equation , we substitute value of x into case 2 equation;
16mmy-1y=0
(16mm-1)y=0
y is length of weighing arm and cannot be 0,
therefore ,
16mm-1 =0
16mm=1
mm=1/16
m= square root (1/16)
m=+-1/4
m is weight of melon and cant be negative.
Hence m, weight of one melon is 1/4 kg
( C ) 6
2cm b)
= 100 + 100 = 200 m
Time taken by train = 10 sec.
∵ Speed = Distance/Time
⇒ Speed of train = 200/10 = 20 m/sec.
∴ Speed of train = 20 × 18/5 = 72 kmph.
In question they left 10 seconds
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
let original radius=100
original surface area lets say it x =4 * (22/7) * 100 *100
new radius=100 + 50% of 100=150
new surface area lets say it y = 4 * (22/7)* 150* 150
increase in surface area=((y-x)/x) * 100
i.e.
((4*(22/7)*150*150 – 4*(22/7)*100 *100) / (4*(22/7)*100*100))*100
=125
so the answer is 125%.
hope this helps you.
let x be sum.
SI of 18% for 1 year= x*18/100=0.18x;
SI of 18% for 2 years is 0.36x;
SI of 12% for 1 year= x*12/100=0.12x;
SI of 12% for 2 years is 0.24x;
Given, 0.36x-0.24x=840
0.12x=840
x=840/0.12=7000.
6/5
1 ball – 4 runs (1st batter – 94+4=98)
2 ball – 3 runs and one run is short run during running between the wicket (1st batter- 98+3-1 =100)and strike changes for 2nd batter
3 ball – 6 runs ( 2nd batter 94+6=100)
3:4
3x:4x
3x+4x=420
7x=420
x=60
smaller number=3(60)=180.