4, 5, 15, 49, 201, 1011, 6073
Perimeter of semi circular = πr+2r
Where r is radius , π = 22/7
πr+2r= 144 (given)
(22/7)r +2r = 144
22r+14r = 144*7 (multiply both sides by 7)
36r = 144*7
r= 144*7/36 = 28
radius =28 cm
Area =( 1/2)πr^2
Area=( 1/2 )*(22/7)*28*28
= 1232cm^2
Ans : area is 1232 cm^2
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
Explanation:
72 — 9
? —- 1
=> Down Stream = 8
45 —- 9
? —- 1
=> Up Stream = 5
Speed od current S = ?
S = (8 – 5)/2 = 1.5 kmph.
a printer produced 176400 lines in 420 minutes
it produces 176400/420 lines per minute = 420
answer is : 420 lines per minutes
Length of train = 125Mtrs
Speed of man = 5Km/Hr
=(5*1000)/(1*3600)
=1.4M/s
Time taken for train to pass = 10s
Spd = D/T
Total Distance (Man distance+ Train Length)
#Distance covered by Man in 10s
D=Spd*T
= (1.4M/s*10s)
= 14Mtrs
#Train length = 125Mtrs
Total D = 14Mtrs + 125Mtrs
= 139Mtrs
Time taken = 10s
Sp = D/t
=139M/10s
=13.9M/s
option c is the answer
as
1/2 for household
1/4 for rent
1/5 for travel
remaining for deposit in bank(i.e) 1/2+1/4+1/5=19/20 ; 1-19/20=1/20
so 1/20 for deposit
1/20(x)=50
hence x=1000
option c is the answer
volume of cylinder=volume of plane
pi*r*R*H=L*B*H
16PI*H=176
SO h= length=176/16*pi
ANser is 44pi
The first number is 10 and the second number is 5
under pressure a person more effort to his work
Correct option is A)
2nd term =(1stterm×1+2)=(4×1+2)=6
3rd term =(2ndterm×2+3)=(6×2+3)=15
4th term =(3rdterm×3+4)=(15×3+4)=49
5th term =(4thterm×4+5)=(49×4+5)=201 and so on
∴5 is wrong.